Technician holding a white PVC window sash in a kitchen
Price on requestFree measuring visit, installation to GOST with vapour and waterproofing of the joint.Calculate

PVC Window Installation in Astana

Bedroom · PVC

Single-leaf

Compact window for a bedroom or kitchen, installed with fitting — from 42 500 ₸ per window.

Technician holds a new white PVC window handle, showing the replacement
GoogleYandex MapsZoon

5,02 reviews

What a PVC window replacement involves

Window replacement means removing the old frame and installing a new profile with double glazing and hardware.

How it is built

A new PVC window consists of a multi-chamber profile, double glazing, hardware and seals. During replacement, the old frame is removed together with the leaves, and the opening is prepared for the new unit: old wooden windows are usually replaced with PVC entirely, not in parts.

During replacement, the old frame with leaves is removed, the opening is cleaned and prepared, then the new unit is installed and the joint is sealed. Unlike repair, where individual parts are changed, here the whole structure is renewed: profile, double glazing and hardware.

New white PVC window in a bare wall opening, the joint at the wall filled with mounting foam
per price list

PVC window installation per m², standard

5 years

Warranty on window installation

3 years

Warranty on double glazing replacement

Profiles
PVCWoodAluminiumBay windowBalcony block

How new window installation in Astana is performed

The frame is fixed with anchors or mounting plates, and the joint is closed with vapour and waterproofing to GOST.

Close-up of the installation joint: cured foam between the white PVC frame and the concrete opening
  • 01Anchor fixing

    The frame is fixed with anchors through the profile into the wall; spacing and depth depend on the opening material.

  • 02Mounting plates

    Flexible plates fix the frame to the reveal or wall, convenient for narrow and corner openings.

  • 03Vapour and waterproofing

    The inner joint is closed with vapour barrier, the outer with waterproofing, to prevent freezing.

  • 04Checking the joint after installation

    Inspect the inner joint: the vapour barrier tape should be without breaks and fit tightly to the frame and wall. Outside, check the waterproofing and make sure there are no gaps or peeling.

Types of PVC windows and glazing

Five window designs for different openings: from a compact leaf to a noise-reduction structure.

Single-leaf

Bedroom, kitchen, children's room

Technician holds a new white PVC window handle, showing the replacement

Compact single-leaf window for small openings and vents.

from 42 500 ₸

Double-leaf

Living room, bedroom

A craftsman holds a white plastic window reveal panel for finishing in his hand

Two leaves with tilt-and-turn mechanism for ventilation.

from 65 500 ₸

Balcony block

Loggia, balcony

Technician fitting a white metal drip sill under a window during installation

Window with a balcony door, a single unit with a shared frame.

from 95 500 ₸

Bay window

Panel and brick buildings

Technician holding a white PVC profile for a bay window

Several leaves at an angle, turnkey installation per m² of opening.

from 60 000 ₸/m²

Soundproof

Homes by the road

Hands holding a triple-glazed unit sample with a grey spacer frame: window noise insulation

We select the profile and double glazing to match the street noise level.

from 60 000 ₸/m²

PVC window installation prices in Astana

Price list for work and products; the final cost is fixed in the order after measuring.

Type of workPrice
Installation of a PVC windowstandard installationfrom 4 650₸ per m²
Window installation to GOSTwith vapour and waterproofingfrom 5 200₸ per m²
Dismantling of old windowhaul-away and disposalfrom 1 800₸ per m²
Single-leaf PVC windowwith installationfrom 42 500₸ per window
Double-leaf PVC windowwith installationfrom 65 500₸ per window
PVC window with installationturnkeyfrom 60 000₸ per m²
Balcony block with doorwith installationfrom 95 500₸ per unit
PVC window sill installationwith cuttingfrom 5 500₸ per linear m
Drip sill installationexternalfrom 3 250₸ per linear m
PVC reveals (sandwich panels)with fixingsfrom 4 700₸ per linear m
Reveals for a standard windowturnkeyfrom 15 000₸ per window
Sealing of external jointsafter installationfrom 2 000₸ per linear m

The price is fixed in the order after measuringThe cost calculation based on opening parameters includes area, number of leaves and type of double glazingRemoval, reveals, window sill and drip cap are calculated as separate price items

Calculate by your dimensions

Why customers order window replacement in Astana from us

Facts about the company that matter when ordering window replacement in Astana.

Installation warranty5 years

Warranty on window installation — 5 years.

Double glazing warranty3 years

Warranty on double glazing replacement — 3 years.

Measuring0 ₸

Measuring and consultation are free; the measurer will come at a convenient time.

Work without days offDaily

We work without days off, daily 09:00–22:00.

PaymentAfter

Payment after installation: cash, card or Kaspi.

Coverage17 cities

You can order in 17 cities of Kazakhstan.

WhatsApp response5 min

We reply on WhatsApp within 5 minutes.

Urgent double glazing1 day

Urgent production and replacement of double glazing — within one day.

How window installation in an apartment in Astana is carried out

Four steps from request to acceptance of the finished window.

  1. A hand holds a smartphone with a dark screen by a white PVC window in a bright room
    01Measuring

    Request and measuring

    The measurer will come at a convenient time, take the dimensions of the opening and help choose the design.

  2. A tape measure measures the opening of a white PVC window in a bright room with warm walls
    02Production

    Window production

    The window is assembled to the dimensions of the opening; the time depends on the profile and double glazing.

  3. A worker's hands work with the lower profile of a white PVC window frame on the sill
    03Installation

    Removal and installation

    The old frame is removed, the new block is placed in the opening and the joint is sealed.

  4. A finished white PVC window with a clean sill and reveals in a bright room
    04Preparation

    Date coordination and opening preparation

    You agree on the installation date in advance, and prepare the opening for the crew's arrival yourself: remove curtains, appliances and fragile items, and provide access to electricity.

Window installation order stories in Astana

Three requests for window replacement and installation with different tasks.

Craftsman's hands installing a PVC panel on the window reveal of a new window at a country houseReveals after installation
Object
Country house with PVC windows
Task
Reveal finishing
Profile
PVC
Floor
1
Type
Country house
Work
Reveals
  1. Request

    After installing windows at the country house, the reveals were left open; they needed to be closed neatly and without gaps.

  2. What we did

    We finished the reveals with fixings, cut the panels to the size of the opening and closed the joints.

  3. Result

    The opening is closed evenly, the reveals do not let cold in from the street.

I want the same
A craftsman checks how the sash of a new plastic window closes in a panel buildingPanel building
Object
Panel nine-story building
Task
Window replacement
Profile
PVC
Floor
5
Type
Apartment
Work
Installation
  1. Request

    In a nine-story panel building, windows from the 2000s needed to be replaced with new PVC windows.

  2. What we did

    We did the installation: removed the old unit, fitted a new PVC frame into the prepared opening, aligned it by level and sealed the joints.

  3. Result

    The window closes tightly, the sashes open without distortion.

I want the same
A craftsman checks the sash of a new window after installation on a loggia in a new buildingLoggia
Object
New building
Task
Installation on loggia
Profile
PVC
Floor
7
Type
Apartment
Work
Installation
  1. Request

    In a new building after handover, the windows on the loggia were of poor quality; the block needed replacement.

  2. What we did

    We installed on the loggia: removed the old block, installed a new one and closed the wall junctions.

  3. Result

    The loggia became airtight; drafts around the perimeter were eliminated.

I want the same

Good to know

PVC Window Installation in Astana with a 5-Year Workmanship Warranty

We handle pvc window installation astana homeowners can order directly from the crew that does the work, with a free measuring visit, fixings chosen for your profile and floor, and payment only after installation. We back the work with a 5-year warranty on installation, 3 years on glass unit replacement and 1 year on repairs.

How pvc window installation astana begins with a free measuring visit

For pvc window installation astana, measuring sets the size, the fixings and a price fixed in the order. Get it right and everything after it falls into place.

What the measurer checks and how to prepare your opening

Our measurer comes at a time that suits you, takes the opening sizes and helps you choose the design, mesh and fixings, and the visit costs nothing. He reads the window profile, the depth of the reveal and the floor level, because those three decide whether a Z-bracket, a pin or a magnet will hold the frame. For a door screen he checks which profile fits — Economy at 32×10 mm or Prestige at 42×17 mm — and whether the sill leaves room for the bottom rail. Clear the sill and the approach to the window before the visit so the measurer can reach every edge and read the true opening, not a guess from a photo. Every size is confirmed before anything is made. We work seven days a week, so a weekday evening works as well as a Saturday morning.

Why the size is taken on site and not from your own tape measure

A window ordered to a self-measured size rarely fits, because the opening is never perfectly square and the frame needs a mounting gap on every side. Walls in panel blocks bow, plaster corners run out of line, and a tape measure held at an angle adds a centimetre that no fitter can absorb. On site the measurer checks the diagonals, the reveal depth and how far the old frame sits back, then writes the size with the gap already allowed for. The price is fixed in the order after measuring, so a wrong size caught on site costs nothing, while a wrong size caught at delivery means a remake. Our measurer helps you choose the design, mesh and fixings on site, so you can compare options in your own light rather than from a catalogue.

Choosing fixings and a profile for pvc window installation that suit your floor and the Astana cold

Fixing and profile are decided together, under the load your floor carries and the frost outside. Below we take both decisions apart, from the bracket in the wall to the chambers inside the frame.

Z-brackets, pins or magnets and how the floor changes the choice

Which fixing suits which wall and floor
FixingBest forWhat it handles
Z-bracketsPanel houses, standard openingsSpreads load into the wall
Pins (plungers)Upper floors, lighter framesQuick, low-stress fixing
MagnetsEasy-removal screens and framesFast on and off, no tools

Profile width and glass unit depth for a cold-climate flat

For local winters a 70 mm multi-chamber profile with an energy-saving two- or three-glass unit keeps warmth in better than a thin 60 mm frame with a single-chamber unit. The 60 mm class is the budget option for mild openings; 70 mm adds a chamber and a wider thermal break; 80 mm is chosen for large glazing and corner flats where the frame edge gets coldest. Chamber count matters as much as width: five chambers in a 70 mm profile hold heat at the rebate, while a two-chamber frame of the same width loses it faster. More chambers and an energy-saving coating cut heat loss at the frame and glass edges, where cold bridges form first. Ask for the unit formula in writing before you sign the order — the profile name alone says nothing about the glass inside it.

How pvc window installation runs on site, including in winter

From demolition to the final bead of sealant, one working day covers the whole job. Sub-zero weather changes the rhythm of that day, not the result.

From demolition to clean-up and how long one window takes

  • Demolition: the old sash and casing come out with the sill and slopes masked before the first cut.
  • Setting: the new unit is levelled and fixed with the brackets or pins chosen at measuring.
  • Sealing: joints are filled and taped for an airtight, weather-tight fit.
  • Check: sashes are opened, closed and adjusted while the crew is still on site.
  • Clean-up: debris goes with the team, and the frame is left ready to use.

Can windows be installed at minus temperatures in Astana

Winter installation is possible when the crew uses cold-rated expanding sealant and keeps the aperture covered, so the joint sets properly even well below zero. The glazing itself handles frost without issue — the real risk sits in the compound and tape curing too fast in freezing air. That is why the team works in short stages, fills and tapes in one pass, and never leaves a gap exposed overnight. In winter the schedule can stretch compared with summer, mostly for warm-up breaks and slower sealing. If the forecast drops hard, we move the visit rather than rush the work — a joint that cures badly shows up as a draft in the first cold snap.

Warranty, service life and the first-day quality check for pvc window installation

Protection depends on the type of job, not on the window itself, and each kind of work carries its own period. Here is what is protected, and how to confirm the result on the day the crew leaves.

What the 5-year installation warranty actually covers

Protection periods by type of job
JobPeriodWhat is protected
Window installation5 yearsLabour and fitting
Glass replacement3 yearsThe assembly and its fitting
Window repair1 yearLabour and replaced parts

How to check the installation on the first day

On the first day, open and close every sash, run a hand along the joints for draughts and check that the handles turn without force. Sashes should travel the full arc with no rubbing or catching at the frame edge. Locks engage in a single motion, and seals press firm and even along the whole perimeter, with no gaps at the corners. Mist or condensation trapped between the panes signals a problem with the sealed assembly or with ventilation, not with the fitting. A draught or a stiff handle in the first days is usually an adjustment, not a fault, so report it early while the crew can still fine-tune the fittings under warranty.

Repair, a new glass unit or full pvc window installation

Not every faulty window needs to come out of the wall. Below is the deciding test we use, and what a repair visit can still save.

The deciding test between repair and replacement

If the casing is sound and only the seal, fittings or glass fail, we repair it; if it is warped or rotten, a full replacement is the honest answer. Our team checks three points on site: whether the sash closes flush, whether the gasket still compresses under a finger, and whether the hinges and locking points move without grinding. A tired gasket or a slack hinge is an adjustment job, not a new window. A draught after installation is often a worn strip or a loose fitting rather than a failed unit, so a repair visit is worth trying before pricing a whole new opening. We change the gasket on windows from any manufacturer, KBE, Rehau, VEKA or Provedal included, and adjust the hardware so the sash pulls tight again. Ask for the compression test first — it settles most draught complaints in one visit.

When a new glass unit is enough and the frame stays

When mist sits between the panes or the glass is cracked but the casing is solid, we replace just the sealed unit and keep it, with a 3-year warranty on the new one. A double-glazed unit is a closed sandwich of glass and spacer, and once that seal breaks, room moisture condenses on the cold inner face. Cleaning the surface does nothing because the fog is inside. We measure the unit, order it to size and swap it without touching the sill or the reveals, so no plastering or repainting follows. Urgent replacement is possible within one day at a surcharge on the unit. Book it as soon as you see fog, not after a season of it.

A quick guide to choosing between PVC window repair and installation

Five points decide whether a window order goes smoothly or turns into a second visit. Run through them before you sign anything.

  • Measure on site: an opening is never perfectly square, so a real measuring visit beats a tape-measure guess.
  • Match the fixing to the floor: brackets, pins or magnets are chosen for the load the frame carries on that floor.
  • Plan for winter: cold-rated foam and covered openings let installation go ahead below zero.
  • Know the warranty: installation, glass units and repairs each carry their own separate cover.
  • Repair before replacing: a sound frame with failed glass or worn seals can often be saved.

Questions about PVC window installation in Astana

Repair, adjustment, double glazing, warranty

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01Where can I get windows repaired in Astana?

Many window companies in Astana repair windows, including us. We repair plastic windows, replace seals and hardware, and also install new windows.

02If there is a draft around the sash, should the whole window be replaced or will adjustment and a new seal be enough?

Most often it is enough to adjust the sash and replace the seal if the profile and double glazing are intact. The window needs replacing when the frame is damaged or its geometry is off, and this is visible after an inspection.

03When replacing windows, can only the double glazing be changed if the frame itself is still strong?

Yes, if the frame is intact without cracks or distortions, sometimes only the double glazing is replaced, and this is noticeably simpler. The decision is made after an inspection, because the condition of the hardware and the profile matters.

04Is it possible to install windows in winter without making the apartment too cold?

Yes, window replacement is possible in winter: removal and installation are done quickly to keep the opening exposed as little as possible. In severe frost, it is better to confirm the work sequence and timing with the free measuring visit specialist.

05What warranty on window installation is considered normal?

A normal warranty on window installation is at least three years, but many companies offer more. For example, we in Astana provide a five-year warranty on installation.

06What should I do if the window still has a draft after replacement?

First, contact the company that performed the replacement and describe the problem. A technician will inspect, find the cause — for example, insufficient foam in the seam or an unadjusted sash — and fix it under warranty.

Reviews of window installation in Astana

5,0based on 2 reviews
★★★★★
Пишу отзыв по истечении более 10 дней после замены оконных " запчастей". Работа аккуратная. Мастер Батырхан после себя убрал, показал конечный результат, заменил старые части окна на новые. Главное, теперь с окон не дует и в комнатах тепло. Обращайтесь в Центр Окон, если важно соотношение Качества и Цены. Благодарю Вас, Батырхан.
Алия БоташеваOctober 29, 2026 · Review from 2GIS
★★★★★
Хочу выразить благодарность компании «Центр Окон» за качественную работу! Заказывал установку пластиковых окон, и остался очень доволен результатом. Менеджеры подробно проконсультировали, помогли подобрать подходящий вариант и ответили на все вопросы. Замерщик приехал вовремя, а монтаж выполнили аккуратно, быстро и профессионально. После установки всё убрали за собой, окна открываются и закрываются легко, отлично сохраняют тепло и защищают от шума. Видно, что компания ценит своих клиентов и отвечает за качество своих услуг. Рекомендую «Центр Окон» всем, кто ищет надежную компанию для установки окон!
НурсаятJune 26, 2026 · Review from 2GIS