Craftsman by a new plastic window in the living room
from 42 500 ₸ per windowFree measuring visit, installation to GOST, 5-year warranty on workCalculate

PVC Window Installation in Kyzylorda

PVC · standard

PVC window

Single-leaf with installation — from 42 500 ₸ per window, double-leaf — from 65 500 ₸. Suitable for apartments and houses.

Technician holds a new white PVC window handle, showing the replacement
GoogleYandex MapsZoon

5,097 reviews on review sites

What PVC window installation in Kyzylorda includes

Removal of the old frame, preparation of the opening and installation of a new unit with reveals, window sill and drip sill

How the service works

Before installing the new unit, the technician checks the geometry of the opening, levels the base and treats the surface for the installation joint. This determines how tightly the frame fits and whether draughts occur.

The replacement package includes, besides the unit itself, a window sill, drip sill, reveals and fixings. The window sill protects the wall from moisture, the drip sill drains water outside, the reveals insulate and cover the installation joint, and the fixings ensure the sashes open and lock.

New white PVC window in a bare wall opening, the joint at the wall filled with mounting foam
from 4 650 ₸

standard window installation per m²

1 day

installation time for one window

5 years

warranty on installation work

Profiles
PVCAluminiumWoodSoundproofingEnergy efficiency

How a new window is fixed in the opening

The fixing method is chosen based on the wall material and unit weight; if a joint freezes after someone else's installation, reinstallation is carried out

Close-up of the installation joint: cured foam between the white PVC frame and the concrete opening
  • 01Anchor plates

    Flexible plates attach the frame to the opening without damaging the profile. Suitable for most walls.

  • 02Wall dowels

    Rigid fixing through the frame into the wall. Used for heavy units and large openings.

  • 03Combined method

    A combination of plates and dowels for reliable fixing on complex bases.

  • 04Reinstallation to GOST

    Reinstallation differs from initial installation in the scope of work on the opening and joint: the old frame is removed, the opening and joint are prepared anew, and the unit is installed with new insulation. Ask the technician which stages of opening preparation and joint sealing are included in reinstallation.

Types of windows installed during replacement

Five options for different needs: from budget PVC to soundproofing and energy efficiency

PVC standard

PVC profile · double-chamber double glazing

Technician holds a new white PVC window handle, showing the replacement

For apartments and houses with standard requirements for warmth and quiet.

from 42 500 ₸

Aluminium

Aluminium profile · single-chamber

Technician holding a white PVC profile for a bay window

Light and durable, suitable for loggias and large openings.

from 4 650 ₸

Wood

Wooden frame · double glazing

A craftsman holds a white plastic window reveal panel for finishing in his hand

For private houses and country homes where natural material matters.

from 1 800 ₸

Noise protection

Reinforced profile · thick double glazing

Hands holding a triple-glazed unit sample with a grey spacer frame: window noise insulation

For apartments near roads and on windy sides.

from 5 200 ₸

Energy saving

PVC profile · coating

Technician fitting a white metal drip sill under a window during installation

Keeps warmth in winter and reduces heating costs.

from 60 000 ₸

PVC window installation prices in Kyzylorda

Cost of work and structures; the exact amount is fixed after a free measuring visit

Type of workPrice
Installation of a PVC windowstandard installationfrom 4 650₸ per m²
Window installation to GOSTwith vapour and waterproofingfrom 5 200₸ per m²
Dismantling of old windowwith disposalfrom 1 800₸ per m²
Single-leaf PVC windowwith installationfrom 42 500₸ per window
Double-leaf PVC windowwith installationfrom 65 500₸ per window
PVC window with installationturnkeyfrom 60 000₸ per m²
Balcony unit with doorwith installationfrom 95 500₸ per unit
PVC window sill installationwith cuttingfrom 5 500₸ per linear metre
Drip sill installationwith sealingfrom 3 250₸ per linear metre
PVC reveals (sandwich panels)with installationfrom 4 700₸ per linear metre
Reveals for a standard window, turnkeywith finishingfrom 15 000₸ per window
Sealing of external jointswith materialfrom 2 000₸ per linear metre

The price is fixed in the order after measuringMeasuring and consultation are freePayment after installation: cash, card or Kaspi

Calculate the cost

Why customers order window replacement in Kyzylorda from us

Facts about the company: warranty, measuring, payment and price fixing

Warranty on installation5 years

for window installation work

Warranty on double glazing3 years

for double glazing replacement

Measuring and consultation0 ₸

free, at a convenient time

Own productionof structures

and profile painting to match window colour

Paymentafter installation

cash, card or Kaspi

Price fixingin the order

after measuring, no extra charges

Coverage17 cities

of Kazakhstan, including Kyzylorda

WhatsApp response5 minutes

we reply within 5 minutes

How PVC window installation is carried out in Kyzylorda

Four steps from request to finished window

  1. A hand holds a smartphone with a dark screen by a white PVC window in a bright room
    011 day

    Request and measuring

    The measurer checks the opening geometry, wall material and reveal depth, and records dimensions for production.

  2. A tape measure measures the opening of a white PVC window in a bright room with warm walls
    02by dimensions

    Manufacturing

    The window is manufactured to the measured dimensions at the production facility.

  3. A worker's hands work with the lower profile of a white PVC window frame on the sill
    031 day

    Removal and installation

    The old frame is removed, the opening is prepared and the new unit is installed according to GOST.

  4. A finished white PVC window with a clean sill and reveals in a bright room
    04after work

    Check and cleaning

    The technician checks the sashes and hardware and removes debris after installation.

Good to know

PVC Window Installation in Kyzylorda from Our Own Crews with a 5-Year Warranty

We handle pvc window installation in Kyzylorda from the first free measuring visit to the final check, using our own installers rather than subcontractors. The measurer comes at a time that suits you, fixes the price in the order, and you pay only after installation by cash, card or Kaspi. Every installation carries a 5-year warranty.

How pvc window installation kyzylorda begins with a free measuring visit

A measuring visit is not a formality: it is where the size, the system and the fixings are decided. With us it costs nothing, and a specialist comes to your address at a time that suits you.

What the measurer checks and how long the visit takes

Our measurer comes at a convenient time, takes the exact opening size, checks the wall and floor level, and helps you choose the profile, glass unit and fixings in one visit. He measures the bare aperture at several points — width, height and depth — because plastered walls are rarely perfectly square, and notes the sill height and the condition of the reveal. The consultation is free, so you can compare an Economy and a Prestige system on the spot and see how each one changes the light and the usable sill depth. This is how pvc window installation kyzylorda starts for every order, with the opening measured before anything is made. A measurement taken from the old window rather than the bare aperture is the most common reason a unit arrives too small, so the measurer always works from the opening itself.

What a turnkey installation includes and what stays fixed in the order

A turnkey installation covers removal of the old frame, fitting and levelling the new one, sealing the joints, setting the sills and slopes, adjusting the sashes and cleaning up, and the price is fixed in the order after measuring. Our own installers handle every stage, so the crew that measures is the crew that fits the unit. Levelling matters most on the first floor of an apartment block, where a few millimetres of tilt show up as a draught along the sash edge. Sills and slopes are set with the same sealant line as the frame, which keeps rain from tracking back under the profile. Because the price is locked at the measuring stage, any extra work agreed on site is discussed and confirmed before the crew starts, not added to the bill afterwards.

Choosing a profile and glass unit for your window

The profile and the double-glazed unit decide how quiet and warm a room stays through summer heat and winter cold. Here is how the two options differ and when the glazing is replaced on its own.

Economy or Prestige, matching the profile to the room

how the two options compare by depth and use
ParameterEconomyPrestige
Depth32 mm42 mm
Chamber width10 mm17 mm
Best forStandard roomsLarger openings, colder rooms
StiffnessLight and compactDeeper, more rigid

When a new glass unit is enough and the frame can stay

If the surround is sound and the leaves still close tight, we replace only the glass unit, which carries a 3-year warranty, and urgent replacement can be done within one day. A sealed pane fails at the edge seal long before the frame body does, so the hinges and handles usually outlive the glazing by years. Our crews swap the glazed panel without touching the surrounding structure, re-set the beads and check the drainage channels afterwards. Urgent orders are scheduled for the next day once the size is confirmed and the pane is in stock. Fogging between the panes or a film of condensation on the inner surface points to a broken seal, not a warped window — test the leaf with a level and a feeler gauge before ordering a whole new one, because a sound surround rarely needs replacing.

Fixings, sizing and the type of opening

How the window is fixed and how exactly it is sized decide whether it stays level for years. Both questions are settled at measuring, and here is what drives the choice.

Anchors or mounting plates, choosing by wall and floor

Our installers pick the fixing to match the window profile and the floor, using anchors for solid panel walls and mounting plates where the opening or facade calls for a different load path. In panel-block buildings the anchor bites into the concrete around the opening and carries the weight straight into the slab, which is why that route dominates on upper floors. In private houses with brick, block or timber walls, mounting plates often work better: they spread the load across a wider area and let the unit sit true even when the reveal is uneven. Floor height and facade type are checked before anything is drilled, together with the profile depth and the weight of the glazing. The fixing choice also affects how the joint is later sealed and insulated, so it is decided at measuring, not improvised on the day.

Standard and non-standard openings, how size is set

The frame is made to the measured opening with the correct mounting gap on every side, and non-standard openings are handled the same way, just with a custom size. Our measurer records the width and height at several points, notes the deepest and narrowest spots, and checks how far the walls are out of square, because an arched or sloped reveal needs its own geometry rather than a scaled-up standard window. Once the numbers are in, the measurer helps choose the profile, glass unit and fixing that suit the room, and the order carries the exact dimensions the workshop will build to. Leaving the right gap matters more than the exact millimetre of the finished product, because that gap is what the foam and seal fill to keep the joint airtight.

How pvc window installation runs on site from removal to clean-up

On site the work moves in steps, and each step can be checked before the next one starts. Below is how the day looks and what to look at when you accept the job.

The on-site sequence and how long it takes

  • Removal: the crew takes out the old frame, clears the opening and checks the reveal for straight edges.
  • Setting and levelling: the new unit goes in on packers, is levelled in two planes and wedged.
  • Fixing and sealing: anchors or plates hold the frame, the joint is filled with foam, and tape seals it.
  • Window sill and slopes: the board is set with an outward fall, and the slopes are fitted while the fill is workable.
  • Hardware: sashes are hung, handles and tilt positions adjusted, drainage caps checked.
  • Clean-up: offcuts, old fill and packaging leave with the crew, glass wiped down.
  • Same-visit finish: sills and slopes are fitted during the same visit rather than left for later, because the joint has to be closed while the fill is still fresh.

Checking the finished job before you sign off

Before signing off, open and close every sash, run the handle through its tilt and turn positions, look for gaps along the joint and confirm the board sits level with no draught coming through. Press a palm along the perimeter and around the window sill line, then check that the drainage slots under the sashes are open and not painted over. Our installers set and adjust the sashes and check the seal after mounting, so any stiffness is easiest to correct while the crew is still on site. A sash that rubs now will only get worse as the frame settles, so flag it on the spot rather than waiting for the first cold snap. Ask for the foam line to be trimmed flush and the tape pressed down before the team packs up.

Repair, warranty and keeping the window in shape

A failing window does not always mean a new one. Often the frame is sound and only the seals or hardware have worn, so the first step is to understand what is actually wrong and what the cover includes.

Repair or replace, reading the signs

If the frame is intact and the draught comes from worn seals or loose fittings, we repair and adjust it under a 1-year warranty instead of selling a new window. Our crews renew sealing, tighten or swap hardware and realign sashes on units of any make, including KBE, Rehau, VEKA and Provedal profiles. A sash that catches, a handle that turns hard or a hinge that has dropped are adjustment jobs, not swap-out jobs. A draught that appears only in one corner usually points to a failed seal or a shifted sash, both fixable without touching the frame. Ask for a repair visit before ordering a new one — a short inspection tells you which path is cheaper and whether the glazing itself is still sound.

What each warranty covers and how to keep it valid

Cover terms by type of work performed
Work performedCover periodWhat it includes
Installation5 yearsOur fitting work and supplied parts
Glass unit replacement3 yearsThe new glazing and its fitting
Repair1 yearLabour and replaced parts

What to look at when replacing part of a window

A window that works well for years comes down to a few decisions made before the frame ever goes in. Here is what matters most, in short.

  • Start with the measuring visit: accurate sizes and a fixing chosen for your wall and floor prevent most problems later, and the consultation is free.
  • Match the profile to the room: Economy suits bedrooms and kitchens, Prestige holds up better in living rooms and busy openings.
  • Fixings are not an afterthought: anchors, mounting plates or pins are picked for the wall type, not taken off a shelf at random.
  • Seal and check the joint: a properly filled mounting gap and a tested sash keep heat in and drafts out.
  • Keep the paperwork: the warranty stays valid when installation and service are documented, so store the order and the handover notes.

Questions about PVC window installation in Kyzylorda

Work, measuring, dismantling, timelines

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01What is included in window replacement besides the frame and double glazing?

Window replacement includes dismantling the old frame, installing the new one level with the opening, sealing exterior joints, and fitting the windowsill, drip cap, and reveals. You don't need to order these elements separately if they are part of the order.

02How does the measurer determine the size of the new window, by the old frame or by the opening?

The measurer takes dimensions from the opening, not the old frame, to account for wall irregularities and the required installation gap. The free measuring visit and consultation are included, and the price is fixed in the order after measuring.

03Can I replace just one window in an apartment without touching the others?

Yes, you can replace only one window while the others stay as they are. The main thing is that the new window matches the style and profile of the others, and the measurer will help you choose a suitable option.

04What happens to the old window after dismantling in Kyzylorda?

The old frame and double glazing are carefully removed and taken away with the debris after fitting. If you want to keep the frame, let them know in advance, and the team will set it aside separately and not throw it away.

05How long does replacing one window with dismantling the old frame take?

The timeline depends on the size of the opening and the condition of the reveals, and the technician will give a more precise estimate after measuring. If you are replacing several windows, the work is planned so that you are not left without light.

06Can windows be replaced in Kyzylorda in winter without cooling down the apartment?

Yes, fitting is carried out even in cold weather, and the opening is only open during dismantling and installation. The room does not have time to cool down during this period, but in severe frost it is better to plan the work in advance.

Reviews of PVC window installation in Kyzylorda

5,0based on 97 reviews on platforms
All reviews