Warm
PVC profile with double glazing and interior insulation. From 202 500 ₸ per balcony.


Winter here is long, and an open balcony sits under snow for almost half the year
In Petropavlovsk snow lies for a long time and frosts are severe. An open balcony or loggia gets snowed in, and the slab and parapet suffer from moisture. Glazing closes the opening and keeps the balcony dry.
If the balcony will be lived in, we choose a warm PVC profile and insulate the walls. Aluminium frames are enough for storage. For the short summer we install mosquito screens, and the parapet can be clad outside.

warm PVC glazing
cold aluminium
measuring and selection
Four reasons people come to us

Snow and dust on the floor. Cold glazing keeps the balcony dry.
A warm PVC profile and insulation turn the balcony into a room.
They don't hold heat. We remove them and install new ones.
Extending along the window sill adds space.
Five options for the northern winter
PVC · double glazing

For a living balcony in frosts.
Calculated per m²

For loggias and bay windows.
Interior · per m²

Walls, floor, ceiling.
Exterior

Covers the old parapet.
Sliding

For the short summer.
Cost of frames and finishing, we'll give the sum for your balcony at the measuring
| Type of work | Price |
|---|---|
| Cold balcony glazing (aluminium)sliding aluminium frames | from 158 000₸ per balcony |
| Warm balcony glazing (PVC)PVC profile and double glazing | from 202 500₸ per balcony |
| Balcony glazing, per m²calculated by opening area | from 37 500₸ per m² |
| French (panoramic) glazingfloor-to-ceiling glass | from 322 500₸ per balcony |
| Balcony extensionextended along the window sill | from 214 000₸ per balcony |
| Balcony roof or canopyfor upper floors | from 49 000₸ per balcony |
| Removal of old glazingframe removal and disposal | from 5 000₸ per balcony |
| Exterior balcony claddingcorrugated sheet or siding | from 73 000₸ per balcony |
| Interior balcony insulationfor warm glazing | from 6 800₸ per m² |
| PVC window sill installationinside the balcony | from 5 500₸ per linear metre |
| Sliding mosquito screen for balcony and loggiafor new frames | from 17 400₸ per m² |
| Drip sill installationdrains water away from the frame | from 3 250₸ per linear metre |
The price is fixed in the order after measuringFree measuring and consultationPayment after work: cash, card, Kaspi
Book a measuring visitWhat you get
we work across Kazakhstan
on WhatsApp
inspection of the slab and parapet
after measuring
acceptance
from 09:00 to 19:00
frames, screens, cladding, windowsill
cities of Kazakhstan
From request to a warm balcony

Send a photo of the balcony and tell us whether you need it warm or cold. We will reply quickly.

The surveyor measures each side, checks the slab and gives you the order amount.

We install frames, drip sills, windowsill, insulate joints, and optionally screens and cladding.

We check the sashes and joints. Payment after acceptance.
Good to know
We handle balcony and loggia glazing in Petropavlovsk as a direct contractor with our own fitters. We offer cold, warm and sliding systems, a free measuring visit, and a fixed price set in the order after measuring. Window installation carries a 5-year warranty, and you pay after the work is done.
Cold, warm and sliding systems solve three different problems, and the right pick depends on one question: will the balcony become a living room, or is it simply a shield against wind and dust?
Cold glazing uses an aluminium frame and a single pane and keeps wind and dust out, while warm glazing uses a plastic profile with a double-chamber pane and turns the space into usable living area. The metal contour is slim and light, so it barely loads the floor, but it holds heat poorly and sweats on the inner surface in frost. A plastic contour with a double-chamber pane carries insulation and lets you move a desk, a dryer or a sofa onto the loggia. We fit both, and the choice comes down to how you plan to use the space rather than to the profile alone. On a panel-block unit, the deciding factor is usually whether the floor plate and the low wall can carry the extra weight of a heated setup, so the measuring visit checks that before the profile is chosen.
A loggia is recessed into the building and usually suits warm glazing on three sides, while an open balcony with a low parapet more often starts with cold or sliding glazing. A loggia glazing project gains from the side walls: they shield the contour from wind, hold heat longer and allow a full plastic construction with opening sashes. An open balcony loses that shelter, and a heavy heated option on a thin parapet needs reinforcement first. Sliding aluminium sits between the two: it saves depth, opens along rails and keeps rain and dust off without claiming living space. Residents of Petropavlovsk often face a panel house where the floor plate edge and the parapet joint set the limit. Old glazing is no reason to skip measuring: the existing frames and the base decide whether the openings can be reused.
A measuring visit is not only about window sizes. The specialist also assesses the load-bearing parts of the structure and selects the fixing plan, which is why the final price is agreed only after that appointment.
The measurer checks the parapet for cracks and loose sections, the slab for level and rot, and the joint to the room for gaps, because a weak base changes the whole fixing plan. On older loggias the parapet often needs reinforcing before any glazing goes in, and the slab edge can crumble where water has sat for years. We look at how the joint meets the wall, whether the floor slopes inward, and where the fasteners can safely bite. On loggias the parapet is usually a metal rail rather than masonry, so the anchoring logic differs from a standard unit. If the slab is in poor condition, glazing is not the first step, and the inspection flags it before any order is placed rather than after the units arrive.
After the survey, the job follows a set route: fabrication, delivery, fitting and acceptance, with payment collected only when the work is complete.
We fit the glazing with our own installers, and you settle the bill after the work is finished by cash, card or Kaspi, so no prepayment is needed to start balcony and loggia glazing in Petropavlovsk. The sequence is fixed: the measurer locks the dimensions and the price into the order, the workshop builds the frames and panes, then a crew strips out the old structures and mounts the new ones. A standard loggia is usually glazed within a working day when the units are ready, and the team clears the debris before leaving. At acceptance you walk the space with the fitter and check that sashes move smoothly and seals sit tight. Settling up at the end means any defect found during that walk-through is corrected before money changes hands, so the inspection deserves as much attention as the fitting.
| System | Frame | Glass unit | Best for |
|---|---|---|---|
| Cold glazing | Aluminium | Single | Wind and dust protection, unheated balcony |
| Warm glazing | Plastic profile | Double | Living space, insulated loggia |
| Sliding glazing | Aluminium | Single or double | Tight balconies, space saving |
Condensation on a glazed balcony is a symptom, not a verdict. It usually points to a weak glass unit, a worn seal or missing ventilation, and each of those has a practical fix.
Condensation appears when warm indoor air meets a cold glass surface, so a single-chamber pane on an unheated loggia will fog up faster than a double-chamber pane with a tight seal. Moisture also collects along the frame where the old seal has hardened and no longer presses against the sash. Air movement matters just as much: a sealed loggia with no vent traps the humidity that cooking, drying laundry and breathing add every day. A small vent or a gap under the door lets that moist air escape, and without it even a good pane will sweat on the coldest nights.
After glazing we can insulate the loggia and replace the seal in windows of any manufacturer, including KBE, Rehau, VEKA and Provedal, so the frame and the opening stay airtight. Insulation covers the parapet, the slab and the joints to the room, which is where most cold bridges sit in a panel block. We also swap worn fasteners and hardware, because a sash that no longer pulls tight lets frost in along the hinge side. Replacing a worn seal is often cheaper and faster than a new pane, and it removes the draught that makes a balcony feel colder than the thermometer suggests.
Buyers about to sign check two things: what happens if something fails after the work is done, and whether glazing a balcony in a block of flats needs paperwork. We treat both as one conversation.
Glazing that does not change the facade usually needs no separate approval, but a panel-block loggia with a reinforced parapet should be checked against the building rules first, and we flag this at measuring. In panel blocks the slab and parapet carry the load, so the frame layout has to follow what the wall will actually hold. If a pane fails after the job, we can make and swap it within one day for an added charge, which keeps a cracked pane from waiting weeks for a factory slot. Ask for the make and size in writing at handover — that record shortens the replacement visit.
The right glazing for a balcony comes down to how you intend to use it and what the building permits. Here is what to settle before signing anything.
Installation, insulation, condensation, care
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionYes, installation is possible even in frost if the team uses winter installation materials and does not leave open seams. Quality depends on how careful the technicians are, so it is better to agree on the timing in advance.
For a warm balcony, a PVC profile with two seal contours and double-chamber double glazing are used; for a cold one, aluminium is enough. The exact set depends on the balcony and insulation, and it is selected during the free measuring visit.
Moisture settles when warm air from the apartment meets cold glass and ventilation is weak. Supply ventilation, regular airing and insulation of the reveals help; otherwise water will collect in winter too.
Yes, the work is combined: first the frames are installed, then the parapet, floor and reveals are insulated so that cold does not come from outside. The order depends on the structure and is planned during the free measuring visit before installation begins.
The glass is washed with a mild agent and a non-abrasive cloth; the seals are wiped and lubricated with silicone once a year. The fixings and drainage holes are kept clean, so the sashes do not jam or leak.
Yes, the old frames and glass are removed before installing the new ones so they do not interfere with the fixings and do not leave gaps. Removal and disposal of the old structures are discussed in advance during the free measuring visit.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp