PVC profile
Warm profile with a double-glazed unit, from 42 500 ₸ per single-sash window with installation


PVC profile
Warm profile with a double-glazed unit, from 42 500 ₸ per single-sash window with installation

Wood
Eco-friendly material for houses and cottages, from 60 000 ₸ per m² turnkey with installation

Aluminium
Lightweight structures for loggias and gazebos, from 42 500 ₸ per window with installation

Balcony block
Window and door in one block, from 95 500 ₸ per set with installation


5,097 reviews on review sites
A new window solves the problems of old frames: draughts, freezing, street noise and high heating bills.
Window replacement means removing the old frame together with the sashes, installing a new structure to GOST with vapour and waterproofing of the joint, fitting a windowsill and drip sill, and finishing the reveals. As a result, the opening gets a sealed contour with no cold bridges.
The order includes the structure itself, the windowsill, the drip sill and the reveals; the surveyor agrees the exact scope and materials on site. Work is carried out on PVC, wooden and aluminium windows, including balcony blocks and bay windows. The measuring visit and consultation are free, and the price is fixed in the order after measuring — no extra charges during installation.

warranty on window installation
measuring visit and consultation
in the order after measuring
Reasons for replacement include frame wear, draughts, a freezing joint or poor-quality windows in a new building.

The frames have dried out, the sashes don't close, and draughts come through the gaps. Replacing with PVC solves these problems.
The developer installed cheap windows with a thin double-glazed unit. Replacement improves heat and sound insulation.
A freezing joint, condensation and mould around the perimeter are reasons for reinstallation.
Reinstallation is needed if there is a draught from under the windowsill, the joint freezes or the window was installed in breach of technology.
The choice of structure depends on the opening, floor and goals: warmth, quiet or a view. Below are five options with prices per m².
PVC profile, 2-chamber double-glazed unit

A warm window for flats and houses, from 60 000 ₸/m² turnkey with installation.
Solid wood, 2-chamber double-glazed unit

An eco-friendly option for a country house, from 60 000 ₸/m² with installation.
Aluminium, 1-chamber double-glazed unit

A lightweight structure for loggias and gazebos, price calculated individually with installation.
PVC, window and door, 2-chamber

Ready-to-install set for balcony access, from 95 500 ₸ per unit with fitting.
PVC, multi-faceted design

Panoramic views and extra light, from 60 000 ₸/m² turnkey.
Prices for fitting, removal and finishing are from the price list; the exact amount is fixed after measuring.
| Type of work | Price |
|---|---|
| Installation of a PVC windowstandard installation | from 4 650₸ per m² |
| Window installation to GOSTwith vapour and waterproofing | from 5 200₸ per m² |
| Dismantling of the old windowincluding disposal | from 1 800₸ per m² |
| Single-sash PVC windowwith installation | from 42 500₸ per window |
| Double-sash PVC windowwith installation | from 65 500₸ per window |
| PVC window with installationturnkey | from 60 000₸ per m² |
| Balcony block with doorwith installation | from 95 500₸ per item |
| PVC windowsill installationstandard width | from 5 500₸ per linear metre |
| Drip sill installationwith sealing | from 3 250₸ per linear metre |
| PVC reveals (sandwich panels)with fixings | from 4 700₸ per linear metre |
| Reveals for a standard window, turnkeywith finishing | from 15 000₸ per window |
| Sealing of external jointsafter installation | from 2 000₸ per linear metre |
The price is fixed in the order after measuring.Measuring and consultation are free.Payment after fitting: cash, card or Kaspi.
Book a free measuring visitFacts that matter when ordering: fitting warranty, free measuring and price fixing.
for window installation work
the measurer will come at a convenient time
in windows of any manufacturer
from 09:00 to 22:00
we answer questions within 5 minutes
for double glazing replacement
we process orders and provide consultations
you can order in 17 cities of Kazakhstan
Four steps from request to a finished window with finishing.

The measurer will come free of charge, take the dimensions of the opening, help choose the design and fixings.

The window is manufactured to individual dimensions after the order is confirmed.

The old frame is carefully removed, the opening is cleaned and prepared for the new structure.

The new window is installed to GOST with joint insulation, then the window sill, drip sill and reveals are fitted.
Good to know
We handle pvc window installation shymkent homeowners can book with a free measuring visit, our own installers and a 5-year warranty on the fitting. We measure the opening, help you pick the profile, glass unit and fixings, then install and adjust the sashes. You pay after installation.
Repair and replacement are decided by the condition of the frame, sashes and glass unit, not by the age of the window. Below is what can be fixed and what has to be swapped out.
We repair and adjust PVC windows as a real alternative to replacement, with a 1-year warranty on the work and the parts we swap. Most call-outs are a dropped sash, worn hardware, a hardened seal or a handle that no longer latches — all fixable without touching the profile. We re-hang sashes on their hinges, replace the rubber seal, fit new handles and locking points, and adjust the pressure so the sash closes evenly on all four sides. A pane that is still clear and dry stays in place. A window that still closes tight and holds its geometry usually needs adjustment and a fresh seal, not a new frame — replacing it early throws away a sound structure.
A measuring visit is not only about reading the opening. It is where the profile, the glass unit and the fixings get chosen, and where the price is locked into the order.
Our measurer comes at a convenient time, takes the opening sizes and helps choose the design, glass unit and fixings, and the visit is free. He records the width and height at three points on each side, checks how far the walls are out of square, and notes the sill depth, the reveal and the condition of the old frame. On site he settles the profile and the glass unit against the room, the sun side and the dust load, then matches the fixings to the wall material and the floor level. Every pvc window installation shymkent begins with this measuring visit, so the sizes are agreed before anything is ordered. An opening measured to the millimetre leaves the right mounting gap for foam and fasteners; guess the size and the window either jams against the reveal or leaves a draughty gap that no sealant hides.
We fix the price in the order after measuring, so the figure you agree is the figure you pay, and you settle it after installation by cash, card or Kaspi. The measurer writes the profile, glass unit, fittings and fixings into the order on the spot, and the same sheet goes to the workshop as the cutting list. Nothing is ordered before you sign it, which means the quote and the finished window carry identical specifications. Because the price is locked at the measuring stage, any change to the profile or glass unit is agreed before work starts — not discovered on the day of fitting. Keep the signed order: it is the document our crews and your claim both refer back to.
The crew works to a laser level, matches the fixing to the opening and the floor, foams the joints and adjusts the sashes before handover.
Our installers remove the old window, set the new frame by laser level, fix it, foam the joints, refit slopes and sill, then adjust the sashes before handing over. Demolition comes first: the old sashes come out, and the opening is cleared of loose plaster and old foam so the new one has clean edges to sit against. The product is levelled in two planes, fixed through the profile, and the gap is filled with mounting foam in one pass. Slopes and window sills go back on after the foam cures, and the sashes are adjusted for even pressure along the seal. Adjusting the sashes on the day is what catches a frame that settled during foaming — leave it and the first cold snap shows up as a draught along the opening edge.
| Fixing | Best for | What it does |
|---|---|---|
| Anchors | Solid brick and concrete | Pull the profile tight to the wall |
| Mounting plates | Upper floors, narrow piers | Spread load across the masonry |
| Foam | Every joint, all openings | Seal and insulate, never hold |
| Combination | Wide or uneven openings | Anchor plus plate for stability |
Southern sun and fine dust load a window differently from cold and wind. What matters here is not only the number of chambers in the glazing, but also the frame, the seal and how tightly the assembly keeps grit out.
A double-chamber unit suits most flats in the city for warmth and noise, while energy-saving glazing earns its place on the sun-facing and winter-cold sides. A single chamber is lighter and cheaper, but it lets more solar warmth through and muffles street noise less reliably. Energy-saving panes carry a low-emissivity coating that reflects warmth back into the room, which cuts the load on an air conditioner in July and slows loss on clear winter nights. The upgrade pays off unevenly across one flat. On a south-facing wall the gain from coated panes is smaller than on the shaded north side, so spend the upgrade where the temperature swing actually bites, and keep the sunny rooms on a standard double unit.
We fit PVC profiles with EPDM or TPE seals and quality hardware, and we replace the gasket in windows of any maker, including KBE, Rehau, VEKA and Provedal. That strip is what separates a quiet window from a whistling one: EPDM and TPE stay elastic through summer instead of hardening like cheap rubber, and the glazing bead holds the pane tight so grit cannot creep behind it. Fittings matter too, because tilt-and-turn mechanisms with steel stays keep the sash aligned after years of daily opening. Dust wears a gasket faster than high temperature does — one that has gone hard lets grit past and the fittings start to drag, so this strip is the part to check first each season.
A guarantee holds up when the people who gave it are the ones who fitted the window. Below are the terms we work to, how payment runs, and what to do if something goes wrong later.
We give a 5-year guarantee on window installation, a 3-year one on glass unit replacement and a 1-year one on repair, covering labour and the parts we replaced. The period depends on the job, not on the product name: a full fitting is covered for five years, a new sealed unit for three, and a repair call-out for one. Keep the order sheet — it records the scope and the fixed price agreed after measuring, and it is what a claim is checked against. A guarantee is only as good as the crew behind it — a direct installer who fitted the window answers for it, while a middleman has to pass the claim down the chain.
You settle after installation by cash, card or Kaspi, and if a sash starts to stick or the glass fogs, message us on WhatsApp and we reply within 5 minutes, seven days a week. Nothing is due up front: the crew finishes the fitting, you check the sashes, the seals and the drainage, and only then do you pay. The sum stays as fixed in the order after measuring, so the amount you agreed is the amount you hand over once the job is done. Report a sticking sash early — most fitting faults are a quick adjustment within the guarantee, but left through a season they wear the hardware and turn into a bigger task.
A few decisions shape the whole outcome of a window job. Here is what to hold onto once the tape is put away and the last slope is sealed.
Repair, double glazing, winter fitting, PVC profile
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionYes, if the profile and sashes are intact and the issue is with the fixings, seal or sash misalignment, a repair will solve it. Replacement is done when the frame is cracked, the double glazing has fogged up inside, or the opening freezes through.
Yes, if the profile and sashes are intact and the double glazing has fogged up inside or is broken, we replace only that. The warranty on double glazing replacement is three years.
Replacement is also done in winter: dismantling and installation are carried out without long delays so the opening stays open as briefly as possible. The work sequence and timing are confirmed during the free measuring visit.
The profile and colour are selected during the free measuring visit, taking into account the side of the building and the size of the sashes. A light-coloured profile heats up less in the sun than a dark one, so it is usually recommended for the south side.
In a khrushchyovka, the opening is often uneven and the old wooden frames are present, so careful dismantling and levelling are needed. In a new building, the openings are more even, but there can be voids in the joints, and installation is done with sealing all around.
It is best to clarify this with the technician during the free measuring visit. That way you will know in advance who removes the dismantled frames and glass and when, so you are not left with them in the apartment.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp