Technician holds a white PVC frame with double glazing in a living room
from 37 500 ₸ per m²We protect your balcony from dust and sun, extend a cramped one and shield the top floor with a canopyCalculate

Balcony and Loggia Glazing in Shymkent

Dust · affordable

Aluminium

Sliding frames protect the balcony from dust and wind. From 158 000 ₸ per balcony.

Sliding aluminium window: glass panels and insect screen panel in the same tracks
GoogleYandex MapsZoon

5,097 reviews on review sites

What balcony and loggia glazing is in Shymkent

Most often two goals: protection from dust and coolness in the heat

Popular solutions

Shymkent has long hot summers and dusty winds. Light aluminium glazing protects the balcony from dust and is suitable for storage. PVC profile with double glazing keeps the flat cooler for longer and helps in the rare cold winters.

In stalinkas and khrushchyovkas, an extension is often made to enlarge a narrow balcony. In new buildings, panoramic glazing is chosen, and on top floors a canopy is installed.

Balcony glazing design: white PVC frame with a double-glazed unit and an opening sash
from 158 000 ₸

cold glazing

from 214 000 ₸

glazing with extension

free

measuring and selection

5 solutions
AluminiumPVCExtensionCanopyPanoramic

How balcony glazing is performed in Shymkent

Tasks for which frames are most often changed or installed

Anchor plate fastens the balcony PVC frame to the concrete parapet
  • 01Dust flies into the flat

    Through an open balcony, sand gets into the rooms. Sliding aluminium will block this path.

  • 02Stuffy in the room by the balcony

    PVC double glazing cuts off the heat, and the next room becomes easier to breathe in.

  • 03Wood has cracked

    The sun dries old frames, and the sashes warp. We remove them and install new ones.

  • 04No place for flowers

    An extension along the window sill gives a wide shelf and a couple of extra steps inside.

Types of loggia glazing and cladding in Shymkent

Solutions for loggias, khrushchyovkas, stalinkas and new buildings

Sliding aluminium

Light frames

Sliding aluminium glazing of a wide window in a bright room

Blocks dust and wind, convenient for a storage room.

from 158 000 ₸

PVC with double glazing

Warm profile

Warm glazing of the balcony with white plastic windows and double-glazed units

Keeps cool in the heat and warmth in the rare frost.

from 202 500 ₸

Extension on brackets

Wide window sill

Balcony glazing with the frame extended forward beyond the concrete parapet

Gives space for flowers and a dryer on a narrow balcony.

from 214 000 ₸

French

Floor-to-ceiling glass

Panoramic balcony glazing from floor to ceiling balcony glazing

A bright balcony with a view, a frequent choice in new buildings.

from 322 500 ₸

Exterior cladding

Corrugated sheet

Exterior cladding of the balcony with white siding under plastic windows

Hides the old railing and levels the facade.

from 73 000 ₸

Balcony and loggia glazing prices in Shymkent

Prices for frames and work; we will give you the final price for your balcony after the measuring visit

Type of workPrice
Cold balcony glazing (aluminium)sliding aluminium framesfrom 158 000₸ per balcony
Warm balcony glazing (PVC)PVC profile and double glazingfrom 202 500₸ per balcony
Balcony glazing, per m²calculated by opening areafrom 37 500₸ per m²
French (panoramic) glazingglass from floor to ceilingfrom 322 500₸ per balcony
Balcony extensionextended along the window sillfrom 214 000₸ per balcony
Balcony roof or canopyfor upper floorsfrom 49 000₸ per balcony
Removal of old glazingframe removal and disposalfrom 5 000₸ per balcony
Exterior balcony claddingcorrugated sheet or sidingfrom 73 000₸ per balcony
Interior balcony insulationfor warm glazingfrom 6 800₸ per m²
PVC window sill installationinside the balconyfrom 5 500₸ per linear m
Sliding mosquito screen for balcony and loggiafor new framesfrom 17 400₸ per m²
Drip sill installationwater drainage from the framefrom 3 250₸ per linear m

The price is fixed in the order after measuringMeasuring and consultation are freePayment after work: cash, card, Kaspi

Book a measuring visit

Why customers order balcony glazing from us in Shymkent

A few words about how we work

Experiencesince 2012

we work across Kazakhstan

WhatsApp5 minutes

to the first reply

Measuring visitfree

with profile samples

Amountone

the one written in the order

Paymentupon completion

after balcony acceptance

Every day09:00–19:00

including weekends

Screensfor frames

we will match any profile

Network17

of cities where we accept orders

How balcony and loggia glazing is carried out in Shymkent

What happens after your request

  1. A hand holds a smartphone with a dark screen by the balcony window opening
    015 minutes

    Photo and question

    Take photos of the balcony outside and inside and describe what you want. We will reply within five minutes.

  2. A tape measure measures the balcony window opening white PVC frame balcony glazing
    02free

    Visit

    The measurer brings samples, checks the slab and railing, shows options and fixes the price in the order.

  3. Hands assemble a white PVC balcony glazing frame with double glazing in a workshop
    03on schedule

    Installation

    The team removes the old frames, installs new ones with a drip sill, and if needed an extension, canopy and screens.

  4. Finished warm glazing of the loggia with a row of white PVC frames
    04with you

    Inspection

    Together we open every sash and check the seams. You pay only after that.

Good to know

Balcony and Loggia Glazing in Shymkent with Free Measuring

We handle balcony and loggia glazing in Shymkent as a direct contractor with our own installers. We start with a free measuring visit, fix the price in the order, and mount the frames with sealed joints. Payment comes after installation, and window installation carries a 5-year warranty.

Warm or Cold Balcony and Loggia Glazing and Which Profile Fits Your Balcony

The first decision before any measuring visit is warm or cold glazing. It sets the profile, the glass unit and how the loggia will feel through the year.

Warm and Cold Glazing and How They Differ

  • Warm glazing: a multi-chamber PVC profile with tilt-and-turn hardware and a sealed unit that keeps the space usable through winter.
  • Cold glazing: a slim aluminium sliding profile that stops wind, dust and rain but lets the cold through.
  • Frame depth: a warm system needs a deeper frame and a solid parapet to carry sealed units.
  • Use case: a storage loggia rarely needs the warm scheme; a room you sit in through winter does.

Choosing the Glass Unit for the Sunny Side

For a warm scheme we recommend a two-chamber glass unit, and on the sun-facing side we add energy-saving glass that cuts summer heat gain. Shymkent summers push the glazing hard, so a single chamber heats up fast and the loggia turns into an oven by early afternoon. A second chamber slows that transfer and holds warmth back in winter, which matters on a side that faces the sun all day. For balcony and loggia glazing in Shymkent, this choice of glass unit matters most on the sunny side. We also check the frame depth before promising a two-chamber unit — some slim profiles only take one.

Matching the Profile to the Opening

  • Wide loggia openings: a sliding aluminium system keeps the track clear and does not block the walkway.
  • Standard balcony door and window: a PVC tilt-and-turn frame gives full opening and easy cleaning from inside.
  • Narrow sections: fixed glazing without a sash keeps the sightline clean and the structure lighter.
  • How often you open it: a section opened daily needs tilt-and-turn hardware; one opened twice a season does not.
  • Parapet condition: a weak parapet rules out heavy warm systems until it is reinforced.

How the Free Measuring Visit for Balcony and Loggia Glazing Sets Sizes and Fixings

Measuring is not only about numbers. It is the appointment where the fixing type, the reveal and the final price are settled, so the order you sign matches what actually gets installed.

What the Measurer Checks and How the Price Is Fixed

  • Free visit and consultation: the measurer arrives at a time that suits you, takes the sizes and helps choose the design and fixings.
  • Reveal check: the specialist inspects the profile, the parapet and the slope geometry before anything is ordered.
  • Fixing selection: the measurer matches the fastener to your window profile and floor level on the spot.
  • Price locked in the order: the figure agreed after measuring is what you pay, with no recalculation later.
  • What changes cost: altering the configuration afterwards is the main reason quotes drift, so settle every detail while the measurer is there.

Fixings and Sealing That Keep the Frame Tight

  • Anchors and plates: the unit is anchored to the parapet and wall with fasteners chosen for the profile and the floor.
  • Joint sealing: the gap between the new structure and the wall is filled with foam and closed with a weather seal.
  • Our own installers: the same crew that anchors the structure seals the joints, so a single team answers for the result.
  • Why it is decided early: on upper floors the fastener choice is a safety call, not cosmetic, and it is set at measuring rather than improvised later.

How Long Installation Takes and What Comes With It

  • Single working day: a standard unit is fitted within one day, from anchoring to the last seal.
  • Sill included: we fit the window sill during the same job, levelled to the structure.
  • Slopes and flashing: the slopes and the outside flashing go in during the same visit, so the gap is closed in a single pass.
  • Handover check: the crew tests the sashes and shows you how the seals sit before leaving.

Insulation, Condensation and Ventilation After Balcony and Loggia Glazing

A glazed balcony follows its own rules. Without insulation and without air movement, moisture settles on the panes as condensation, so these three topics are planned together with the frames rather than fixed later.

Insulating Before or After the Frames Go In

  • Plan it with the glazing: the parapet and the slab are easiest to treat while the opening is still empty.
  • Insulate first, seal last: vapour barrier and insulation go on the parapet, and the frames close the assembly afterwards.
  • Our sequence: we glaze and insulate as one job, finishing the parapet and slopes in a single visit.
  • Sealing after frames: an airtight joint around a finished frame means tight corners and missed gaps.
  • What to ask for: a continuous vapour barrier on the warm side and sealed joints at every sill connection.

Why Condensation Forms and How to Stop It

  • The cause: warm moist indoor air meets a cold pane, and the water drops out of it as condensation and later frost.
  • Warmer surface: a two-chamber unit keeps the inner pane closer to room temperature, so it stays above the dew point longer.
  • Tighter seals: a worn gasket lets cold air reach the pane edge, and the frame sweats along that line.
  • A way out for moisture: humidity builds up when a glazed loggia has no path for damp air to escape.

Keeping Air Moving on a Glazed Balcony

  • Tilt-and-turn hardware: a tilt position gives slow, steady exchange without a wide-open sash in winter.
  • Two vents, not one: a supply slot low near the floor and an exhaust high under the ceiling move the loop across the room.
  • Daily short bursts: ten minutes of full opening twice a day clears moisture faster than a cracked sash all day.
  • Plan it at measuring: ventilation is a design choice made when sizes and fixings are set, not a habit added later.

Balcony or Loggia, Removal and Load on the Parapet

A balcony and a loggia are different structures, and the house type plus the state of the parapet decide what can be installed at all and whether a removal makes sense.

How a Balcony Differs from a Loggia

  • Balcony: projects from the wall and rests on its own slab, so the floor area is added outside the building line.
  • Loggia: recessed into the facade with side walls and a roof above, so it already has three solid sides.
  • Removal: on a projecting structure it extends the floor outward, while on a recessed one it usually means glazing the existing opening.
  • Fixing points: a loggia gives side walls for anchoring, whereas a projecting frame often relies on the parapet and top slab.
  • Structural risk: a removal on a projecting structure carries more risk than on a recessed loggia, so it is decided case by case at measuring.

Will the Parapet and Slab Carry the Frames

  • Parapet check: the measurer inspects the parapet material and its condition before we commit to a frame type.
  • Slab check: we look at the floor slab for cracks, damp and previous repairs that weaken the base.
  • Fasteners: the measurer picks Z-brackets, pins or magnets to suit the window profile and the floor level.
  • Frame choice: the profile follows from what the structure can safely carry, not from the heaviest option available.

Panel Blocks, Approvals and Glazing in Winter

  • Panel blocks: changing the facade in a panel house follows stricter building rules than in a brick house, so check them first.
  • Brick houses: brick walls usually leave more room for anchoring, but the parapet still needs an inspection.
  • Approvals: confirm the building rules before ordering, since a rebuild after a refused change costs more than the check.
  • Winter work: glazing runs in cold weather with the right sealing, so the season is a scheduling question rather than a technical block.
  • Cold snaps: below-freezing days slow the sealant cure, so the crew plans those steps around the temperature.

Warranty, Payment and Service After Installation

Once the frames are in, three things matter as much as the glazing itself: what the warranty covers at each stage, when you pay, and who answers if something goes wrong later.

Warranty by Stage

Coverage split per work stage, not a single blanket term
StageTermWhat it covers
Window installation5 yearsMounting, sealing, frame fit
Glass unit replacement3 yearsSealed unit failure, fogging
Window repair1 yearLabour and replaced parts

Paying After Installation and Reaching Us

  • Payment on completion: you settle by cash, card or Kaspi once the work is checked, never in advance.
  • WhatsApp replies: we answer within 5 minutes, so a question about a hinge or a draught does not wait days.
  • Seven days a week: the team is available every day, weekends included, which suits households free only on Saturday.
  • Fixed amount: the price is locked in the order after measuring, so the final invoice matches what you agreed.
  • Free measuring first: the visit to take sizes and pick fixings costs nothing and commits you to nothing.

Service, Repairs and Urgent Glass Replacement

  • Urgent sealed-unit swap: a failed pane is made and replaced within a day at a surcharge, which matters when a crack leaves the loggia open to wind.
  • Hardware adjustment: we tighten hinges, realign sashes and restore smooth closing on frames that have started to catch or sag.
  • Seal replacement: worn gaskets on KBE, Rehau, VEKA and Provedal profiles are swapped for new ones to stop draughts and dust.
  • Repair warranty: a year on window repair, covering both the labour and any parts we fit.

How to choose balcony and loggia glazing without mistakes

Glazing a balcony or loggia comes down to a handful of decisions made in the right order, and each one narrows the next.

  • Warm or cold first: this choice fixes the profile and the glazing build-up, so settle it before anything else is discussed.
  • Configuration at measuring: the layout and the price get locked in during the visit, not afterwards.
  • Insulation and ventilation together: plan both alongside the frames, since retrofitting them later costs more work.

Questions about balcony and loggia glazing in Shymkent

Choosing glazing, wind loads, measuring, condensation, door adjustment

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01How does aluminium sliding balcony glazing differ from plastic, and which is easier to maintain?

Aluminium is lighter, and the sashes slide without taking up space, but cold glazing barely holds heat. Plastic frames are warmer and more airtight, but they require care for the seals and hardware.

02Can balcony glazing on upper floors withstand strong winds in Shymkent?

Yes, if the structure and fixings are matched to the floor and wind load. On upper floors the profile and fixings are reinforced, and the type and spacing of anchors are determined by the surveyor based on the condition of the slab and parapet.

03Can a double-glazed unit be installed on a balcony, and will the slab support it?

Usually yes, but the weight of the structure must match the load-bearing capacity of the slab, especially in older buildings. The surveyor assesses the base and, if in doubt, suggests a lighter balcony glazing option.

04How can I tell if the surveyor is measuring the balcony correctly and not overstating the dimensions?

Make sure they measure the opening at several points and take into account the curvature of the walls and parapet. After measuring, the dimensions and price are fixed in the order, so extra centimetres are immediately visible in the document.

05What should I do if condensation collects on the glass after balcony glazing?

First check the ventilation and do not block the air supply; often the cause is the airtightness of warm glazing without inflow. If moisture remains, the sashes need adjustment or the seals need to be checked by a technician.

06What should I do if the balcony door does not close after glazing?

Do not force it; most likely the frame geometry is distorted or the hardware has shifted during installation. Contact the installer: under the 5-year window installation warranty, adjustment is performed free of charge.

Reviews of balcony and loggia glazing in Shymkent

5,0based on 97 reviews on platforms
All reviews