Single-sash
Ready-made unit for a standard opening. Price from 42 500 ₸ per window, installation calculated separately.


Single-sash
Ready-made unit for a standard opening. Price from 42 500 ₸ per window, installation calculated separately.

Double-sash
Two sashes with tilt-and-turn mechanism. Price from 65 500 ₸ per window, measuring free.

Balcony unit
Ready-made set for access to a balcony or loggia. Price from 95 500 ₸ per set.

Bay window
Installation of a bay window with reveal finishing. Cost depends on size and configuration.

Noise reduction
Noise-reduction double glazing for homes by the road. Selected after measuring and consultation.

5,097 reviews on review sites
Window replacement is not just a new unit, but also removal, installation to GOST, reveals, window sill and drip sill.
Window replacement includes removal of the old frame and sashes, fitting a new unit into the prepared opening, sealing the seam and internal finishing. In the price list these works are separate lines so you can see what makes up the order.
Installation to GOST with vapour and waterproofing creates a full protective contour for the seam. Reveals, window sill and drip sill add to the cost, but they are what close the opening inside and out.

Installation and removal are calculated by opening area
Urgent double glazing production with surcharge
Installation with vapour and waterproofing of the seam
The sequence of operations during installation: from preparing the opening to sealing and reinstallation after someone else's work.

Old sashes and frame are removed, the opening is cleaned of dust and leftover fixings.
The seam is protected inside with vapour barrier and outside with waterproofing to prevent freezing.
The frame is levelled and fixed with anchors or plates depending on the wall.
If the seam freezes, the old contour is removed and reinstalled to GOST. Price from 5 200 ₸ per m².
Five designs with different profiles, chamber counts and double glazing. The price per m² is a guide; the exact amount is confirmed after measuring.
Standard opening · PVC

A ready-made unit for a standard opening. Suitable for a bedroom or kitchen.
Tilt-and-turn leaf

Two leaves with a ventilation mechanism. Often installed in living rooms.
Unit and fitting in one line item

A turnkey solution: window and installation are priced together.
Window and door as a set

A set for access to a balcony or loggia with a door.
For homes near a road

Double glazing with enhanced sound insulation. Selected after measuring.
Works and structures with installation, lead time and options — the only price list on the page.
| Type of work | Price |
|---|---|
| Dismantling of old windowremoval of sashes and frame before installation | from 1 800₸ per m² |
| Installation of PVC windowfitting the unit into the prepared opening | from 4 650₸ per m² |
| Installation to GOST with vapour and waterproofingfull seam insulation contour | from 5 200₸ per m² |
| Single-sash PVC windowready-made unit for a standard opening | from 42 500₸ per window |
| Double-sash PVC windowwith tilt-and-turn sash | from 65 500₸ per window |
| Window with installationunit and fitting in one line item | from 60 000₸ per m² |
| Balcony unit with doorwindow and door as one set | from 95 500₸ per item |
| Installation of PVC window sillwith cutting and fixing | from 5 500₸ per linear metre |
| Installation of drip sillexternal reveal with sealing | from 3 250₸ per linear metre |
| PVC reveals from sandwich panelsinternal finishing of the opening | from 4 700₸ per linear metre |
| Reveals for a standard window, turnkeyset for one window | from 15 000₸ per window |
| Sealing of external seamsrestoring the external contour | from 2 000₸ per linear metre |
The price is fixed in the order after measuring.Measuring and consultation are free.Payment after installation: cash, card, Kaspi.
Book a measuring visitEight facts about our work: warranty, measuring, price, schedule and payment.
Warranty on window installation — 5 years.
The surveyor will come at a convenient time and help you choose a design.
Urgent production and replacement of a double glazing unit is possible within one day, at a surcharge to the price of the glass unit.
We work seven days a week.
Payment after installation: cash, card or Kaspi.
Warranty on double glazing replacement — 3 years.
Warranty on window repair — 1 year for work and components.
You can order in 17 cities of Kazakhstan.
Four steps from request to finished window.

What the surveyor does on site: checks the geometry of the opening, the depth of the installation gap and the wall material so that installation goes without rework.

The unit is made to measure. Express double glazing is possible in a short time.

What happens on installation day with the apartment's furnishings: work area, protection of floors and furniture, removal of the old frame and leaves.

What the customer should check themselves on acceptance: leaf movement, hardware operation, evenness of the window sill and reveal.
Good to know
We handle pvc window installation oskemen homeowners can book with a free measuring visit and our own installers, not subcontractors. We fix the price in the order after measuring, take payment only after installation, and back the work with a 5-year warranty on window installation. Repair and glass unit replacement are quoted separately.
Draughts and fogging do not always mean a new window is needed. The right call depends on the state of the frame and the sashes, and most complaints split into three scenarios worth telling apart before anyone quotes a replacement.
We start with adjustment and seal replacement when the surround and sashes are still solid and the draught runs along the perimeter. Hardware that no longer pulls the sash tight lets air slip through the gap, and a dropped sash leaves a visible wedge of daylight at the top corner. Both are fixed by re-hanging the sash and resetting the locking points, without touching the glass or the profile. A seal that has flattened over years lets air through even on a sound window, so replacing it in any manufacturer's profile (KBE, Rehau, VEKA, Provedal) often removes the draught without touching the frame. That kind of repair costs a fraction of a swap and keeps the original geometry intact, so ask for a seal check before you agree to a full replacement.
A glass unit swap is the right call when the surround is fine but the pane is fogged, cracked or lost its seal between the layers. Fogging between the panes means the sealed cavity has failed and no amount of cleaning fixes it, while a cracked pane weakens the whole assembly and should be replaced before the frame is stressed further. We measure the old one, order a new glass unit to the same dimensions and swap it inside the existing profile, so the frame, sashes and hardware stay in place. Urgent glass unit replacement takes one day with a surcharge on the unit price. Check whether the opening is square and the sashes close flush first, because a new pane in a warped frame will fog again within a season.
Measuring is the first step, and it costs nothing. The measurer arrives when it suits you, takes the sizes and helps pick the profile, glass unit and fixings for your particular opening and floor.
Measuring and consultation are free, and the measurer comes at a time that suits you to take sizes and help choose the design, mesh and fixings. On site we look at the reveal depth, the wall material, the sill and how the sash opens, then match a profile and glass unit to what the opening can carry. Fixings are chosen at the same visit: Z-brackets, pins or magnets depending on the profile and the floor. Getting the opening measured on site rather than from your own tape avoids the millimetre errors that later show up as gaps at the reveal or a sash that will not close flush. This is how pvc window installation oskemen begins — with an accurate measuring visit before any work is ordered.
After measuring we fix the price in the order, then our own installers remove the old unit, set the new frame, seal the joints and check the sashes before clean-up. The crew levels the frame, foams and tapes the perimeter, refits the sill and trims, and tests that every sash opens and locks without rubbing. Payment comes after installation, by cash, card or Kaspi, and the price stays as written in the order. The quality check happens on the same day, so any sash that rubs or a joint that is not tight is corrected while the crew is still on site rather than on a return visit.
Size and fixings decide how a window sits in its opening and whether the seal holds over the years. Below is what the measurer weighs up for each window type and floor level.
The measurer picks the fixing to match the window type and the floor, using Z-brackets, pins or magnets depending on the opening. Z-shaped brackets hook onto the frame and the reveal for a firm mechanical hold, pins drive into the profile for a flush fit, and magnets suit openings where drilling is unwanted. Our measurer checks the frame type and the floor level before settling on one option. A fixing that is right for a ground-floor reveal can be wrong higher up, where wind load and the wall material change, so the choice is made per opening, not copied from a neighbour's job.
| Opening / element | What the measurer checks | Why it matters |
|---|---|---|
| Window opening | Width, height, reveal depth | Wrong size leaves gaps or a tight fit |
| PVC frame | Wall thickness, chamber depth | Holds the frame square over years |
| Glass unit | Number of panes, cavity | Affects warmth and condensation |
| Fixings | Profile type, floor level | Keeps the frame anchored and sealed |
Terms agreed in advance are what separate a direct installer from a middleman. Below are the cover periods for each type of work and the payment conditions.
We give a 5-year guarantee on window installation, a 3-year term on glass unit replacement and a 1-year cover on window repair that includes labour and replaced parts. The three periods stay apart on purpose: a new window, a fresh glass unit and a repair carry different loads on the frame, the sashes and the seals. On a repair, the twelve-month term applies both to the fitter's labour and to any part we swap in, so a replaced handle or seal is covered on the same basis. On installation, the five-year term follows the whole assembly, not just the frame. A guarantee that names the work and the parts separately tells you what is actually covered, so ask which of the three applies before the fitters start rather than after a problem appears.
The price is fixed in the order after measuring, and you pay after installation by cash, card or Kaspi. No deposit is taken at the measuring stage, so the figure you agree to is the figure you settle once the work is finished and you have checked the sashes, the seals and the hardware yourself. If the measurer finds that the opening needs a different profile or an extra fixing, that is settled in the order before any work begins, not added as a surprise at the end. Fixing the sum in advance and settling only once the task is done means the final figure cannot drift with extra materials or a longer day on site.
Installation continues through the cold months, but the temperature changes how the work is planned. Below is what shifts in winter and which profile and glass choices suit the region's climate best.
Yes, we install windows in winter, and the crew works seven days a week so the job can be scheduled around the weather. Cold affects the mounting foam more than the frame itself, so the installers keep the reveal within the foam's working temperature and shield the joint until it cures. Our own installers handle the whole visit, which means the same team sets the frame, seals the perimeter and checks the sashes before leaving. Winter jobs are planned rather than rushed: on the coldest days the crew may start later in the morning, once the wall has warmed, and finish the sealing in one pass. Ask for the foam specification before the visit — a winter-grade foam cures at lower temperatures and holds the joint through the first frost. That single detail matters more than any speed of work on a January morning.
For a cold region the frame's chamber depth and the glazing cavity matter more than the colour or the handle style. A multi-chamber profile slows heat loss through the frame, while a wider cavity in the glass unit reduces the transfer across the pane. The seal along the sash perimeter is what keeps the whole assembly airtight; a worn gasket lets warm air meet the cold edge and condensation appears there first. That is why the payoff of a deeper frame and a broader cavity shows up on the coldest mornings rather than on the showroom sample. When the seal is replaced, the perimeter is checked along the full sash, not just at the corners. Residents of the city feel the difference in draughts near the hinges long before the heating bill changes.
The right call depends on the frame, the panes and the opening, not on guesswork. Here is the short version to carry into the measuring visit.
Uneven openings, reveals, adjustment, removal of old frames
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionYes, an uneven opening is not a problem: the surveyor takes slopes into account and selects the fixings, while the seams are sealed with vapour and waterproofing. If the deviations are significant, the opening is levelled first, so the window sits straight and there are no draughts.
Sometimes it can, if the reveals and windowsill are in good condition and can be carefully preserved during removal. But more often the old reveals get damaged, and then they are replaced together with the window to avoid gaps and draughts.
First, try adjusting the hardware and replacing the seal: this is often enough if the profile is intact. If the sash is warped, the frame is deformed or there are draughts along the seams, only a window replacement will help.
The fitters work on one window at a time: they remove the old one, prepare the opening, install the new one and adjust the sashes, without leaving the room open for long. It is best to move furniture away from the window in advance and keep the child in another room during the work.
We take out and remove the old frames and glass ourselves right after dismantling, so you do not have to look for transport. Specify the volume during the free measuring visit — the fitters will plan the removal based on the number of windows.
The exact time depends on the size of the opening and the amount of finishing, and will be given after the measuring visit. If there are several windows, the fitter will discuss the order of work in advance. Measuring and consultation are free.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp