Craftsman at a new plastic window in a studio living room
Installation from 1 800 ₸ per m²Free measuring visit, installation to GOST with vapour and waterproofing, 5-year warranty on installation.Calculate

PVC Window Installation in Semey

Plastic · PVC profile

PVC window

Installation of a standard PVC window — from 4 650 ₸ per m², turnkey with installation — from 60 000 ₸ per m².

Technician holds a new white PVC window handle, showing the replacement
GoogleYandex MapsZoon

5,097 reviews on review sites

What PVC window installation in Semey includes

Removal of the old frame, installation of the new structure, windowsill, flashing and reveals — the work that makes a window warm and airtight.

How it works

Window replacement is not just a new frame with double glazing. The work includes removal of the old structure with disposal, installation of the new one to GOST with vapour and waterproofing, and fitting of the windowsill, flashing and reveals. Every element affects warmth and protection from moisture.

In Semey there are openings in panel buildings, Stalin-era buildings and new builds. In panel buildings the walls are thin and openings often have slight vertical deviations, so precise fitting of the frame matters. In Stalin-era buildings the openings are wider and taller, often with wooden frames that require careful removal. In new builds the walls settle, and the joint needs a margin for sealing. The master determines the type of opening during the measuring visit and selects the fixings and insulation.

New white PVC window in a bare wall opening, the joint at the wall filled with mounting foam
from 4 650 ₸/m²

installation of a standard PVC window

5 years

warranty on window installation

1 day

urgent double glazing replacement

Types of structures
PVC windowWoodenAluminiumBalcony blockDouble glazing

How a new window is fixed in the opening in Semey

Installation to GOST with vapour and waterproofing, fixing with anchors or plates, sealing the joint — these stages determine whether the seam will freeze.

Close-up of the installation joint: cured foam between the white PVC frame and the concrete opening
  • 01Installation to GOST

    The frame is levelled, fixed with anchors or mounting plates, then the joint is filled with expanding foam with vapour and waterproofing.

  • 02Anchors and plates

    Anchors provide rigid fixing into the wall, plates are used for narrow openings and wooden windows. The choice depends on the wall material and the weight of the structure.

  • 03Vapour barrier and pre-compressed tape

    Inside, the joint is covered with vapour barrier tape, outside — with pre-compressed sealing tape, so that moisture does not penetrate the insulation and destroy the joint.

  • 04Reinstallation after someone else's installation

    If the seam freezes, the window is re-installed according to GOST: the old layer is removed, re-insulated and sealed. Sealing of external seams — from 2 000 ₸ per linear metre.

  • 05Seam care in the first heating season

    During the first heating season, check the seam perimeter: draughts are noticed by cold air from under the windowsill, condensation on the reveals and freezing corners. Inspect the joint along the entire perimeter, pay attention to cracks in the foam and peeling of the vapour barrier tape. If the draught does not disappear after adjusting the sashes, call a technician for seam diagnostics.

Types of windows and glazing to choose in Semey

Profile, filling and hardware are selected for the task: warmth, quiet, light or budget. The measurer will help you choose the design and double glazing.

PVC profile

Warmth and quiet

Technician holds a new white PVC window handle, showing the replacement

Plastic window with turnkey installation — from 60 000 ₸ per m². Suitable for apartments and offices.

from 60 000 ₸/m²

Wooden window

Repair or replacement

Hands holding a triple-glazed unit sample with a grey spacer frame: window noise insulation

Repair of wooden windows — from 1 800 ₸, replacement with PVC — at the installation price from 4 650 ₸ per m².

from 1 800 ₸

Aluminium window

Lightweight structures

Technician holding a white PVC profile for a bay window

Aluminium is installed on balconies, loggias and verandas. Installation — from 4 650 ₸ per m², according to GOST — from 5 200 ₸ per m².

from 4 650 ₸/m²

Energy-saving double glazing

Less heat loss

A craftsman holds a white plastic window reveal panel for finishing in his hand

Replacement of double glazing — with a 3-year warranty. Urgent production and replacement — within one day.

from 15 200 ₸/m²

Hardware

Lifespan and repair

Technician fitting a white metal drip sill under a window during installation

Original hardware lasts longer than analogues and is repairable. Selected for the profile and sash weight.

from 4 700 ₸/linear m

PVC window installation prices in Semey

The cost of work and structures is indicated per unit; the price is fixed in the order after measuring.

Type of workPrice
Installation of a PVC windowstandard installationfrom 4 650₸ per m²
Window installation to GOSTwith vapour and waterproofingfrom 5 200₸ per m²
Dismantling of old windowwith disposalfrom 1 800₸ per m²
Single-leaf PVC windowwith installationfrom 42 500₸ per window
Double-leaf PVC windowwith installationfrom 65 500₸ per window
PVC window with installationturnkeyfrom 60 000₸ per m²
Balcony block with doorwith installationfrom 95 500₸ per unit
Installation of PVC windowsillwith trimmingfrom 5 500₸ per linear metre
Installation of window flashingwith sealingfrom 3 250₸ per linear metre
PVC reveals (sandwich panels)with fittingsfrom 4 700₸ per linear metre
Reveals for a standard window, turnkeywith materialfrom 15 000₸ per window
Sealing of external jointswith pre-compressed sealing tapefrom 2 000₸ per linear metre

The price unit includes dismantling and installation work, as well as removal of the old frame.Measuring and consultation — free.Payment after installation: cash, card or Kaspi.

Book a measuring visit

Why customers order window replacement in Semey from us

Facts about the company: installation warranty, free measuring, work without days off and payment after installation.

Installation warranty5 years

For window installation — 5 years, for double glazing replacement — 3 years.

Measuring0 ₸

Measuring and consultation are free, the measurer will come at a convenient time.

Work without days offdaily

We accept requests every day, including Saturday and Sunday, from 09:00 to 19:00 in Semey.

Payment after installation3 methods

Cash, card or Kaspi — after completion of work.

Price fixationin the order

The price is fixed in the order after measuring, without additional charges during work.

Window repair1 year

Warranty for window repair — 1 year for work and replaced components.

Sealany

We replace seals in windows of any manufacturer: KBE, Rehau, VEKA, Provedal.

Coverage17 cities

You can order in 17 cities of Kazakhstan.

How PVC window installation is carried out in Semey

Four steps from request to window check.

  1. A hand holds a smartphone with a dark screen by a white PVC window in a bright room
    01Measuring

    Measuring

    The measurer will come at a convenient time, take the dimensions of the opening, help choose the design and fixings.

  2. A tape measure measures the opening of a white PVC window in a bright room with warm walls
    02Production

    Production

    The structure is made to your dimensions. The time depends on the window type and double glazing, specified when ordering.

  3. A worker's hands work with the lower profile of a white PVC window frame on the sill
    03Installation

    Installation

    On the installation day, clear the opening of furniture and curtains, provide access to sockets. Dismantling the old window and installing the new one takes several hours, the exact time is given by the technician during measuring.

  4. A finished white PVC window with a clean sill and reveals in a bright room
    04Check

    Check

    The sashes, hardware and seam tightness are checked, and they show how to care for the window.

Good to know

PVC Window Installation in Semey from Our Own Crews with a 5-Year Warranty

We handle pvc window installation semey residents can book directly with the crew that does the work, not through a middleman. A free measuring visit sets the size, profile and fixings for your opening and floor, our own installers fit the window, and you pay only after installation. Every fitting carries a 5-year workmanship warranty.

When a new window makes sense and when your old one can still be saved

Not every tired-looking window needs to come out of the wall. We look at the frame, the sashes and the glass unit first, and only then decide what actually has to change.

Three options and how to tell which one your window needs

matching the fault to the right job
What is wrongWhat we checkThe job that fits
Glass is misted or cracked, frame soundFrame straightness, fittings, sealsGlass unit replacement
Draughts, stiff handles, sash rubbingSeals, hinges, alignmentRepair and adjustment
Warped frame, rotten or cold revealWhole opening and profileFull window installation

Why a glass unit swap is often enough and when it is not

We replace the sealed glazing on its own whenever the frame and sashes are still solid, and a standard swap can be turned around within a single day when you need it urgently. A sound profile outlives its glass, so paying for a whole new window when only the sealed unit has failed mostly buys you nothing extra. Our glass unit replacement work carries a 3-year warranty, and the urgent one-day option is there for a broken pane in a bedroom or a shopfront that cannot wait. The swap only pays off while the frame is straight and the fittings still close tight, though. A pane that keeps misting after a swap usually means the frame seal or the drainage is at fault, so the glass was never the real culprit.

How pvc window installation semey starts with a free measuring visit

Every job begins with a measuring call that costs nothing: the surveyor takes the size of your opening, checks the wall and level, and helps you pick the profile, glass unit and fixing for your building.

What the measurer checks and why the opening size decides everything

Our surveyor comes at a time that suits you, measures the aperture, checks the wall and level, and helps you choose the design, mesh and fastenings on the spot, all free of charge. The appointment covers more than a tape measure: the specialist notes the reveal depth, how square the aperture is, the sill height and how the frame will sit against the masonry, then fixes the order price on the spot. Measuring and consultation cost nothing, and the surveyor is available seven days a week. A millimetre lost at this stage shows up later as a draught or a sticking sash, so the appointment is where most fitting faults are actually prevented. This is why pvc window installation semey starts with a free measuring visit before any work is scheduled.

Choosing a profile, glass unit and fixing for your floor and building

Matching frame, glazing and fastening to each opening
ChoiceOptions we fitWhat it suits
ProfileEconomy, PrestigeStandard rooms vs larger sashes
Glass unitSingle or double chamberWarmer rooms, colder winters
FixingAnchors, plates, Z-bracketsPanel, timber or aluminium openings

How pvc window installation runs on site from removal to clean-up

The job moves through clear stages — taking out the old window, setting and foaming the new one, finishing the opening, adjusting the fittings and clearing the room. Here is what each stage involves.

The step-by-step fitting and what a turnkey job includes

  • Removal: the old window comes out, and the opening is cleared, checked and measured again before anything new goes in.
  • Setting the frame: the new window is levelled on load-bearing blocks and packed tight to the wall.
  • Foaming: the gap is filled in layers so the seal cures evenly instead of trapping a soft core.
  • Sill and reveal: the sill, drip and panels are fitted to close the opening and shed water away.
  • Adjustment: hinges and handles are set so every moving part closes evenly against the gasket.
  • Clean-up: offcuts and dust are cleared before we hand the room back to you.

How long the work takes and when the reveals can go on

A single window is usually fitted within a working day, and the panels go on once the foam has cured, which is why we never rush the finishing stage. Removal, setting on blocks and filling take the bulk of the morning; the sill and drip then close the opening, and the fittings are adjusted last so each movable part pulls evenly against the gasket. The seal needs time to harden through its full depth rather than just at the skin, and that wait decides when the panels can follow. Closing the opening over a soft layer traps moisture behind the panel, and that is exactly where cold bridges and mould appear a season later. Ask the crew to show you the cured line before the panels go up — a firm, dry surface means the opening is ready to close.

Warranty, payment and how to check the work on the day

A guarantee and a clear payment moment separate a direct crew from a middleman. Here is what our cover includes, and how to accept a finished window on the day it goes in.

What the 5-year warranty covers and what it does not

Every window we install carries a 5-year guarantee on the fitting, a 3-year one on glass unit replacement and a 1-year one on repair work and the parts we replace. That cover includes the frame fixing, the seals we set and the alignment of the sashes, so a sash that drops or a seal that lets in a draught is our job to correct. It does not cover damage from a third party, a window taken out and refitted by someone else, or glass broken after handover. The cover stays valid while the unit is left untouched, so call us first if anything feels off.

How to accept the finished window and pay after installation

  • Open and close: every sash should move smoothly and latch without force, with no scraping.
  • Check the seals: run a hand round the joints for draughts while the window is shut.
  • Look at the reveal: it should sit flat and feel dry, not soft or cold.
  • Confirm the order: the fixed price and cover terms are written down before the crew leaves.
  • Pay after: settle by cash, card or Kaspi once the window is in.

Winter fitting, draughts and keeping the window tight through the seasons

Semey winters bring hard frost and steady wind, and both test how tightly a window sits in its frame. This section covers cold-weather fitting, why a window can draught or mist up, and how reveals are insulated.

Fitting in the cold and in timber or panel openings

We fit windows into panel, timber and aluminium walls and work through the cold months, taking extra care with foam and sealing when the temperature drops. Below minus five degrees the foam cures slowly, so the crew keeps the surface dry, warms it and lets the sealant set before trimming. Panel walls in the older blocks are often uneven by a few millimetres, and we level the frame with packers rather than forcing it into place. In a timber house the reveal keeps moving with the seasons, so the fixing has to allow for that movement or the frame will bind within a year. Ask the measurer to note the wall material and the floor level on the order — that single line decides which fixings and which foam the crew brings to the job.

What to do when a window draughts or mists up after fitting

A draught once the work is done usually traces back to a seal or a joint at the edge rather than the window itself, and we fix it by replacing the gasket or insulating the gap. We change rubber seals in windows of any maker, including KBE, Rehau, VEKA and Provedal profiles, because the material hardens and loses its grip over several cold seasons. Wind on an upper floor finds the smallest gap under the sill, so the crew checks those joints first and re-foams where the old insulation has cracked. Glass that mists on the room side points to ventilation, not a failed unit, so opening the sash daily often clears what a new glass unit would not. If the misting sits between the panes, the sealed unit has failed and needs swapping.

What to look for when replacing a window in winter

A window decision comes down to a few checks: what is actually faulty, what the measuring visit confirms, and what the fitting and paperwork should include. Here is the short version to keep before you book anything.

  • Diagnose first: decide whether the frame, the glazing or just the fittings are at fault, because each points to a different job.
  • Measure before you order: the free measuring visit fixes the size, profile and fixing, and it is where most fitting problems are prevented.
  • Expect the full sequence: a turnkey job runs from removal through foaming and reveals to adjustment and clean-up.
  • Check the paperwork: a 5-year workmanship guarantee, a 3-year glazing guarantee and payment after installation mark a direct installer.
  • Mind the season: insulated reveals keep a window tight through the cold, and a draught usually means a worn seal, not a new window.

Questions about PVC window installation in Semey

Stages, installation, double glazing, profile

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01When is it better to replace a window rather than repair it?

If the frame is warped, the sashes have sagged and cannot be adjusted, cracks have appeared in the profile, or there is cold penetration along the seam, a repair will not help and a new window is needed. When the defect is local (seal, hardware, double glazing), a repair is sufficient.

02What is included in a window replacement besides installing a new frame?

In addition to installing the structure, a replacement includes removing the old window, sealing the seams, installing the sill and reveals, and adjusting the hardware. The exact list depends on the condition of the opening and your preferences.

03Is it possible to install windows in winter without the room getting too cold?

Yes, installation is possible in cold weather: the technicians work quickly and use a heat curtain to keep the room from cooling down. The main thing is that the temperature is not extremely low, otherwise the foam and sealant lose their properties.

04Which double glazing should I choose for an apartment to keep it quiet and warm?

For quiet and warmth, a double-chamber double glazing with an energy-saving coating and different glass thicknesses is suitable. We will select the specific parameters during the free measuring visit, taking into account the floor and the side of the building.

05Will a window be replaced in Semey if the opening is uneven?

Yes, the measurer will take the unevenness into account and choose an installation method so that the window sits level. In complex cases, additional preparation of the opening may be required, which will be agreed in advance.

06What should I consider when replacing a window in an older building?

In older buildings, the opening may be uneven and the old window may be difficult to remove. The measurer will assess the condition and suggest the best installation method.

07What fixings are used for window installation?

Anchors or brackets are used for installation, depending on the wall material and the type of window. The fixings are selected to ensure reliable fastening and proper operation of the sashes.

08Which profile should I choose for a new window to prevent drafts?

Pay attention to the number of chambers and the wall thickness of the profile: multi-chamber systems with good thermal insulation are suitable for a cold climate. The measurer will help you choose an option for your home and budget.

Reviews of PVC window installation in Semey

5,0based on 97 reviews on platforms
All reviews