Single-leaf window
With installation from 42 500 ₸ per window. Suitable for a kitchen, bathroom or small bedroom.


Single-leaf window
With installation from 42 500 ₸ per window. Suitable for a kitchen, bathroom or small bedroom.

Double-leaf window
With installation from 65 500 ₸ per window. The standard choice for a living room and bedroom in an apartment.

Balcony block
With installation from 95 500 ₸ per unit. A window and door for a loggia or balcony.

Turnkey window
From 60 000 ₸ per m² with installation. For those replacing windows right after the building is handed over.

Installation to GOST
From 5 200 ₸ per m² with vapour and waterproofing. For houses and dachas with a cold envelope.

5,097 reviews on review sites
Window replacement means removing the old frame and fitting a new PVC profile structure with double glazing and hardware.
A PVC window consists of a frame and sashes made of PVC profile, double glazing, hardware with handles and seals. During replacement the whole unit is changed, or individual elements if the frame stays.
Replacement includes removing the old window, preparing the opening, fitting the new frame, foaming and insulating the seam, and adjusting the sashes. Reveals, window sill and drip sill are fitted separately or together with the window.

warranty on window installation under contract
measuring visit and consultation before ordering
urgent double glazing production with a surcharge
The frame is fixed in the opening in one of three ways, and the seam around the perimeter is insulated inside and outside.

Flexible plates are attached to the frame and wall, convenient for installation in an opening with uneven edges.
Drilling the frame and fixing with anchors into the wall, used with a level opening and thick walls.
A combination of plates and anchors when the opening is complex or the window is large.
If the seam freezes after someone else's installation, the window is removed and reinstalled with vapour and waterproofing.
The options differ in the number of sashes, construction type and package. The price is per unit or per square metre including installation.
PVC, tilt-and-turn

A compact window for the kitchen, bathroom or a small room. Including installation.
PVC, two sashes

The standard for a living room and bedroom, one sash is usually tilt-and-turn.
Window and door

A set for access to a loggia or balcony, including installation and adjustment.
Including installation per m²

Price per square metre of the construction including installation, convenient for calculating large openings.
Replacement without frame

Replaced when the frame and hardware are intact but the glass fogs up or is broken.
Prices for work and constructions, the final cost is fixed after measuring.
| Type of work | Price |
|---|---|
| Installation of a PVC windowstandard installation | from 4 650₸ per m² |
| Window installation to GOSTwith vapour and waterproofing | from 5 200₸ per m² |
| Dismantling of old windowwith disposal | from 1 800₸ per m² |
| Single-leaf PVC windowwith installation | from 42 500₸ per window |
| Double-leaf PVC windowwith installation | from 65 500₸ per window |
| PVC window with installationturnkey | from 60 000₸ per m² |
| Balcony block with doorwith installation | from 95 500₸ per unit |
| PVC window sill installationwith cutting | from 5 500₸ per linear m |
| Drip sill installationwith sealing | from 3 250₸ per linear m |
| PVC reveals (sandwich panels)with installation | from 4 700₸ per linear m |
| Reveals for a standard window, turnkeywith material | from 15 000₸ per window |
| Sealing of external jointswith material | from 2 000₸ per linear m |
The price is fixed in the order after measuringMeasuring and consultation are freePayment after installation: cash, card, Kaspi
Calculate by your dimensionsFacts about timelines, warranty and working conditions that matter when choosing a contractor.
For window installation work under the contract.
For double glazing replacement.
We accept requests every day, in Aktau from 09:00 to 19:00.
Own production: we manufacture constructions without intermediaries.
Warranty for double glazing replacement is 3 years.
We work every day, in Aktau from 09:00 to 19:00.
You can order in 17 cities of Kazakhstan.
We place orders and consult at the office on Seifullina, 404.
Four steps from request to handover of the finished window.

The measurer arrives free of charge, takes the opening dimensions and helps choose the construction.

They agree on the installation date and prepare the opening for the team's arrival.

The old window is removed with disposal, a new frame is installed, foamed and the seam is insulated.

The work is accepted according to the act and instructions for window care are provided.
Good to know
We handle pvc window installation aktau with our own crews, not subcontractors. A free measuring visit comes first, then the measurer picks the profile, glass unit and fixings for your building and floor. We install, seal, fit slopes and adjust the hardware, back the work with a 5-year warranty, and you pay only after installation.
Not every old window needs replacing. Before we quote anything, we look at the frame, the sashes, the glazing and the weatherstripping, and only then recommend a fix or a swap.
We check four things before recommending anything — the frame, the sashes, the glazing and the weatherstripping — and if the structure is sound, repair usually wins. PVC window installation in Aktau starts with the same inspection, so we treat it as the deciding step rather than a formality. Straight profiles, corners that stay tight and panes without fog between them all point to repair: fresh hardware, adjusted hinges and a clean drainage channel. We replace worn gaskets on units from any manufacturer, KBE, Rehau, VEKA or Provedal included, and match the fittings to what is already there. A sash that drags or whistles is often a hardware and draught problem, not a reason to tear out a serviceable unit — ask for an inspection first, because a fix keeps the original profile and the wall joint intact.
A cracked or warped frame, rot at the base, or a structure that no longer holds hardware means replacement, and we say so plainly instead of patching it. Panel blocks across the city were built decades apart, and older ones sometimes lose their geometry after years of wind load and temperature swings, so sashes stop closing flush no matter how the hinges are adjusted. Fitting a fresh sash into a failing base saves a day now but returns as draughts and condensation within a season. When the old unit has to go, we remove it completely rather than mounting an overlay on top — that hides the problem and traps moisture between the two layers. If the bottom is soft to the touch or the corners have opened, plan for a full replacement and a rebuilt wall joint.
Installation follows a fixed sequence rather than improvisation. Below is what happens from demolition of the old unit to the final adjustment, and how to check the result before the crew leaves.
Slopes go on only after the foam has cured, and before we leave we check the sash swing, the seal line and the hardware on every opening. Foam needs several hours to set, so slopes are fitted the same day only on small openings; larger ones are finished on a return visit. On the first-day check the crew opens and closes each sash, runs a hand along the seal to feel for gaps and tests the handle and hinges. A window that closes with a light push and shows an even seal gap all round is set correctly; a tight corner means the frame is out of level, and that is corrected before handover, not left for later.
Dimensions and hardware are settled at the measuring visit, never by eye. The house type and the storey decide what holds the frame in the opening, so both get checked before anything is ordered.
The measurer comes at a time that suits you, takes the opening sizes, and helps you choose the profile, glass unit and fixings — measuring and consultation are free. He checks the reveal depth, the square of the opening and the condition of the mounting surface, then notes the wall material and the storey. Those details feed straight into the hardware choice: the same profile needs different parts in a panel wall than in brick. A tape measure at home misses the reveal depth and out-of-square walls, which are exactly what decide the frame dimensions. Ask the measurer to show you where the frame line will sit before the order is signed — that sketch prevents most size disputes later.
| Fixing type | Best for | What it does |
|---|---|---|
| Anchors | Panel and solid walls | Bolt deep into the wall |
| Mounting plates | Brick and block | Spread the load along the reveal |
| Pins | Light frames, tight reveals | Hold without wide drilling |
Heat, wind-blown sand and a steady sea breeze set their own demands on a window, so the frame and the glazing need to be chosen together, not by habit or by what a neighbour installed.
More chambers in a PVC profile mean more sealed air pockets, and those pockets are what slow thermal transfer and stiffen the sash against gusts. A three-chamber section copes with a calm inland facade, while five or six add rigidity that shows up on an exposed wall facing the sea. The steel insert inside the frame matters as much as the count: the deeper it sits, the less the sash flexes when a strong gust hits it. For a blustery coastal city, stiffness counts as much as insulation, so a sturdier section earns its keep on upper floors that take the full wind. Ask which liner goes into the frame before comparing counts — a six-chamber shell with a thin insert bends like a three-chamber one.
| Glass unit | Keeps out | Suits |
|---|---|---|
| Single chamber | Some noise, light dust | Quiet inner rooms |
| Two chambers | Solar load, dust, street noise | Most living rooms |
| Two chambers, coated | Strong sun and glare | South-facing and balconies |
Terms are worth reading before you sign, not once something goes wrong. Below is what we cover, how the order is paid, and what quietly voids the guarantee.
We give a 5-year guarantee on window installation, a 3-year term on glass unit replacement and a 12-month term on window repair covering both labour and replaced parts. Installation cover applies to the joint, the levelling and the fixings our crews set — the parts of the job that depend on hands rather than on the profile supplier. Glass units carry their own 3-year span because a sealed chamber either holds its seal or fails early, and failures show up well inside that period. Repair work is covered for twelve months, including the parts we swap out. The guarantee covers our workmanship, so it stays valid as long as the window is not altered by someone else or damaged by the building settling. In our practice, most claims come from a window re-hung by a third party — keep the original paperwork and the claim stays simple.
The price is fixed in the order once measuring is done, and you settle by cash, card or Kaspi when the job is finished — we reply on WhatsApp within 5 minutes and work seven days a week. Locking the price at that point means the quote you agree to is the one you pay, with no surprise add-ons at the end. The measurer takes the sizes, checks the opening and helps pick the profile, glass unit and fixings on the spot, so nothing is guessed from a photo. Order direct with the crew that installs, and the same people who measured answer questions later. On a busy week, sending opening photos on WhatsApp before the visit shortens the measuring call and lets us bring the right fixings for your floor.
A window job goes right or wrong on a handful of decisions, and most of them are taken long before the first screw goes in.
House types, double glazing, fitting, disposal
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionIn a panel building the opening is often more even, but the load-bearing panels must not be weakened, so fixings are chosen with extra care. In a private house it depends more on the wall material and the condition of the opening, and the surveyor will take these nuances into account.
The fitters arrive at the agreed time, first cover the furniture and floor, then remove the old window and install the new one with sealed joints. The timing depends on the size and condition of the opening; the fitter will give a more precise estimate after the free measuring visit.
For a windy side, it is better to choose a multi-chamber double glazing with an energy-saving coating — it is quieter and warmer. The surveyor will help you choose the right option for your side and floor free of charge.
The removal team takes out and disposes of the old frames and double glazing themselves — this is included in the turnkey replacement. It is worth discussing disposal in advance during the measuring visit so that old windows are not left in the yard or on the landing.
If you are replacing a window in your own apartment with a structure of the same size and not touching the load-bearing wall, separate approval is usually not required. Enlarging the opening or changing the facade already requires permission — it is better to clarify this before ordering.
Yes, an uneven opening is not a problem: the surveyor takes actual measurements and selects a frame taking wall differences into account. During fitting, the gaps are filled with expanding foam and reveals, so an old wooden window can be replaced with a plastic one without reworking the opening.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp