Craftsman on a warm glazed loggia by new windows
from 37 500 ₸ per m²Sand and wind stay outside, and the price in the order after measuring will not changeCalculate

Balcony and Loggia Glazing in Aktau

Dust and wind · aluminium

Cold

Sliding aluminium frames protect the balcony from sand, wind and rain. From 158 000 ₸ per balcony.

Technician holds a thin white aluminium frame profile, showing cold glazing
GoogleYandex MapsZoon

5,097 reviews on review sites

What balcony and loggia glazing includes

Frames, glass, drip sills and windowsills are selected for your balcony, not by template

Scope of work

Glazing encloses the balcony with frames around the perimeter: cold aluminium if you need protection from wind and sand, or warm PVC if the balcony will become part of the apartment. In Aktau with sea wind and dust, even cold glazing noticeably changes life on the balcony.

The surveyor will inspect the slab and parapet, recommend a profile and opening type. You can separately order extension, canopy, cladding, insulation, windowsill and mosquito screens.

Balcony glazing design: white PVC frame with a double-glazed unit and an opening sash
from 37 500 ₸

glazing per square metre

free

measuring and consultation

in the order

price is fixed after measuring

5 types
ColdWarmPanoramicExtendedCanopy

How loggia glazing is performed

The four most common reasons people come to us

Anchor plate fastens the balcony PVC frame to the concrete parapet
  • 01Balcony open

    Sand on the floor, things can't be left. Cold aluminium glazing will protect the balcony from dust and rain.

  • 02Need a warm room

    You want a study or children's area. We install PVC profile with double glazing and insulate inside.

  • 03Old wooden frames

    Frames have dried out and let in draughts. We remove them and install new glazing.

  • 04Balcony too narrow

    Extended glazing adds space along the windowsill without touching the slab.

Types of balcony glazing to choose from

From lightweight aluminium frames to panoramic floor-to-ceiling glass

Cold

Aluminium · sliding

Technician holds a thin white aluminium frame profile, showing cold glazing

Protection from wind, dust and rain without insulation.

from 158 000 ₸

Warm

PVC · double glazing

Warm glazing of a loggia with white PVC frames, double glazing and insulated walls

Warm in winter, quiet, balcony as another room.

from 202 500 ₸

Panoramic

Floor-to-ceiling

Panoramic balcony glazing from floor to ceiling balcony glazing

Maximum light and view, ideal for new builds.

from 322 500 ₸

With extension

Wider on the windowsill

A craftsman holds a white PVC corner piece for extending the frame beyond the parapet

Adds space on a cramped balcony.

from 214 000 ₸

By area

Calculated per m²

Hands measure a balcony parapet with a tape measure before glazing

For non-standard openings and loggias.

from 37 500 ₸/m²

Balcony and loggia glazing prices in Aktau

Cost of work and materials; we'll give you the exact price for your balcony after the measuring visit

Type of workPrice
Cold balcony glazing (aluminium)sliding aluminium framesfrom 158 000₸ per balcony
Warm balcony glazing (PVC)PVC profile and double glazingfrom 202 500₸ per balcony
Balcony glazing, per m²calculated by opening areafrom 37 500₸ per m²
French (panoramic) glazingfloor-to-ceiling glassfrom 322 500₸ per balcony
Balcony extensionextended along the windowsillfrom 214 000₸ per balcony
Balcony roof or canopyfor upper floorsfrom 49 000₸ per balcony
Removal of old glazingframe removal and disposalfrom 5 000₸ per balcony
Exterior balcony claddingcorrugated sheet or sidingfrom 73 000₸ per balcony
Interior balcony insulationfor warm glazingfrom 6 800₸ per m²
PVC windowsill installationinside the balconyfrom 5 500₸ per linear metre
Sliding mosquito screen for balcony and loggiafor new framesfrom 17 400₸ per m²
Drip sill installationwater drainage from the framefrom 3 250₸ per linear metre

The price is fixed in the order after measuringMeasuring and consultation are freePayment after work: cash, card, Kaspi

Book a measuring visit

Why customers in Aktau order glazing from us

No empty promises, just how we work

Experiencesince 2012

we work across Kazakhstan

Response5 minutes

on WhatsApp, to the point

Measuringfree

balcony inspection and profile selection

Pricein the order

does not change after measuring

Paymentafter

cash, card or Kaspi

Hours09:00–19:00

no days off

Screensfor frames

we install mosquito screens right away

Cities17

cities of Kazakhstan

How balcony glazing is carried out in Aktau

Four steps from request to handover

  1. A hand holds a smartphone with a dark screen by the balcony window opening
    015 minutes

    Request

    Send a photo of your balcony on WhatsApp and tell us what you want: dust protection or a warm room. We'll reply and schedule a measuring visit.

  2. A tape measure measures the balcony window opening white PVC frame balcony glazing
    02free

    Measuring

    The surveyor checks the slab and parapet, takes measurements, and helps choose the profile and opening type. The price goes into the order.

  3. Hands assemble a white PVC balcony glazing frame with double glazing in a workshop
    03on schedule

    Installation

    We remove the old frames, install the new ones, fit the drip sill and windowsill, foam and seal the joints.

  4. Finished warm glazing of the loggia with a row of white PVC frames
    04with you present

    Handover

    We check how the sashes open and show you how to care for the frames. Payment after acceptance.

Good to know

Balcony and Loggia Glazing in Aktau with a Free Measuring Visit

We handle balcony and loggia glazing in Aktau as a direct contractor with our own installers, not through an aggregator. A free measuring visit comes at a time that suits you, the measurer picks the fixings for your window profile and floor, and the price is fixed in the order after measuring. You pay only after installation.

Choosing Between Warm and Cold Balcony and Loggia Glazing for Aktau

Heat, blown sand and steady wind decide more about glazing projects than any catalogue picture. Below we compare the warm and cold options and show how the frame affects tightness.

Warm and Cold Glazing Compared by Profile, Insulation and Use

Warm versus cold systems by build and purpose
ParameterWarm glazingCold glazing
FramePVC, multi-chamberSlim aluminium, sliding
GlassSealed glass unitSingle pane or thin unit
InsulationHolds warmth, cuts noiseLight and ventilation only
Best useRoom to be joinedSeasonal balcony, storage

How Heat, Sand and Wind Shape the Choice of Profile and Hardware

We match the frame and hardware to local conditions, because sand and wind load the sash seal far more than in a mild climate. Fine dust works into the gap between leaf and frame, and a loose fit lets it settle on the inner sill within a season. Hardware with adjustable cams pulls the leaf tighter against the gasket, and a quality rubber seal keeps that line closed under wind pressure. On upper floors the load grows with exposure, so hinge and scissor choice matters as much as chamber width. A tighter fit and a quality gasket cut dust ingress and draughts, so the leaf stays easy to close even after a windy season.

How the Free Measuring Visit Sets the Size and Fixings for Your Balcony and Loggia Glazing

This step is the first real stage of any job. Here is what happens on site, why the opening size and the fixing type decide how the frame behaves, and how the agreed figure is locked in.

What the Measurer Checks and Why Size and Fixings Matter

Our specialist comes at a convenient time, takes the exact opening sizes and helps you choose the design, mesh and fixings, and the measuring costs nothing. He works around the frame rather than the glass alone: he checks the reveal depth, how square the opening sits, the sill line and the wall material at each anchor point. Fixings are then picked for your window profile and floor, using Z-brackets, pin plungers or magnets depending on what the profile and height allow. The bracket carries the load, so a wrong pick shows up months later as a sagging leaf, a draught along the top edge or a screen that rattles in the wind off the Caspian. On upper floors the wind load is higher, and the specialist adjusts anchor spacing rather than adding extra brackets at random.

How the Price Is Fixed After Measuring

We fix the price in the order right after the measuring, so the figure you agree on stays the same once the work is scheduled. The scope goes into the document on the spot: profile type, mesh grade, fixing set and the number of leaves, and that list is what you sign. Nothing is added later for brackets, colour matching of the frame or the trip itself, because those items already sit inside the agreed sum. If insulation, slope work or a sill replacement comes up during the measuring, it goes into the same paperwork before anything is signed. Agreeing that scope early keeps the final bill free of surprises and gives you a written record of what the crew will install. Payment follows installation, by cash, card or Kaspi, so the fixed figure is settled only after the work is done and checked.

Installation Steps and What the Balcony and Loggia Glazing Work Includes

This section walks through the fitting itself: what the team does beyond the frame, how long it takes, and how to accept the finished work so nothing important slips past you.

What the Installation Covers Beyond the Frame

Our installers fit the profiles, sashes and glass unit, seal the joints, set the hardware and check that every sash closes and presses evenly. The job also covers the parts most people forget: foam and tape along the wall joint, exterior flashing over the head, sill and drip details that shed rain, and the trims that cover the gap between profile and opening. Hardware gets aligned so handles turn without force, and the seals sit fully in their grooves rather than pinched at the corners. On the loggia side, the team clears debris and checks that the drainage channels in the lower profile are open. This is how balcony and loggia glazing in Aktau is carried out from start to finish, with every joint and seal checked before handover.

How Long It Takes and How to Accept the Finished Work

Installation timing depends on the size of the opening, and you can stay in the flat while our team works, since the mess is kept to the opening. Small units with two or three panels move faster; larger loggias with a door and extra sections take longer, and the installers tell you the expected finish before starting. Glass units are handled and set one by one, so expect the noisiest part around the middle of the day. At handover, open and close every sash, check the press and look for gaps at the seal, because small fixes are quick now and costly later. Also confirm the drainage slots are clear and the handles latch without slack before you sign off.

Insulation and Prep Work Before Your Balcony and Loggia Glazing Goes In

Thermal prep and glazing are usually planned together on a balcony, yet the order of work decides how the finished space performs. Here is when the extra work earns its place and how the sequence runs.

When Insulation Makes Sense and the Right Order of Work

Insulation and slopes are planned as part of the same job, so the glazing, thermal barrier and finishing line up in one sequence. In practice the crew strips the old sill, lays mineral wool on the floor and parapet, then closes the joints around the new frame and the slopes in a single pass. On an open loggia the parapet and ceiling slab are the coldest surfaces, so they take a wool layer with a vapour barrier ahead of the finishing panels. Doing this work while the frames are still out lets the crew seal the joints and slopes in one pass, which keeps cold bridges and draughts out of the finished space. Book it together with the frames, not afterwards — re-opening a finished slope to add a missing barrier costs far more than planning it up front.

Combining the Balcony with a Room and What It Requires

Combining a balcony with a room needs warm glazing, thermal prep and often approval, so it is planned ahead of ordering the frames rather than afterwards. A warm frame with double-chamber glass units and a heated floor keeps the joined zone comfortable through the winter, while a cold single-chamber layout turns it into a glass box that pulls heat out of the room. The wall between the two spaces usually comes down only once the load-bearing status is confirmed and municipal rules allow it. A well-prepared loggia holds warmth and stays usable in winter, but ventilation has to be designed too, or condensation returns. Keep a trickle vent in the frame or a small wall valve near the radiator — sealed warm glazing with no air exchange fogs up by morning even when every step is done well.

Warranty, Payment and Service After Your Balcony and Loggia Glazing

Here we set out what the guarantee covers on fitting and glass units, when you pay, and how to look after hardware and seals once the work is finished.

What the Warranty Covers and How Payment Works

Covered items, guarantee terms and how you settle the bill
What is coveredTermWhat it includes
Window installation5 yearsFitting and adjustment of the block
Glass unit replacement3 yearsThe new unit and its fitting
Window repair1 yearLabour and replaced parts
PaymentAfter fittingCash, card or Kaspi

Caring for Hardware and Seals in Sandy, Windy Conditions

  • Wipe the tracks: sweep sand from sash and guide rails every few weeks, because grit wears the rollers and stops the sash closing flush.
  • Check the sash pressure: turn the eccentrics a quarter-step when the sash whistles in wind, so the seal presses evenly.
  • Ventilate daily: air the room ten minutes twice a day, since condensation forms when warm moist air cannot escape past a closed block.
  • Clean the seal gently: wash it with a soft cloth and mild soap, then apply a silicone care stick so it does not dry and crack.
  • Call us for replacement: we renew the seal on windows of any make, including KBE, Rehau, VEKA and Provedal, so a worn part does not mean a new frame.

What to know before balcony glazing

A balcony or loggia project comes down to five decisions — warmth, measurement, installation, insulation and long-term care. Here is what to keep in mind before signing the order.

  • Warm versus cold: the choice follows the climate first, then the way you plan to use the room all year round.
  • Free measuring: the visit sets exact sizes, profile and fixings, and the price stays fixed in the order afterwards.
  • Installation day: the block goes in within a working day, with handover checks on opening, seals and drainage.
  • One sequence: insulation, slopes and glazing are planned together so the frame is not disturbed twice.
  • Aftercare: warranty terms and regular cleaning of hardware and seals keep the block working through sand and wind.

Questions about balcony and loggia glazing in Aktau

Installation, insulation, double glazing, fittings

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01Can a balcony be glazed without extensions, using the existing railing?

Yes, it can. When glazing on the railing, the load on the parapet is higher, so the technician will check its condition and reinforce it if necessary.

02Which double glazing should I choose for a balcony on the sunny side to avoid a greenhouse effect in summer?

For the sunny side, double glazing with an energy-saving coating or tinting is suitable. It reflects some of the heat and keeps the space cool, but the final choice depends on the window and your needs.

03Do I need to insulate the parapet and floor before glazing the balcony?

If you plan to use the balcony all year round, insulation of the parapet and floor is essential. Without it, even warm glazing will not provide a comfortable temperature in winter.

04What should I do if the balcony slab is uneven or has cracks?

First, the condition of the slab needs to be assessed: cracks and misalignments may require repair or reinforcement. During the free measuring visit, the technician will check the base and suggest a solution so the structure is installed reliably.

05Can I live in the apartment during the installation of balcony glazing?

Yes, you can: installation is quick and does not create a lot of mess. The technicians work carefully and clean up afterwards, so you do not need to be present for long.

06Which fittings should be installed on a balcony door so it does not sag from the heat?

For a hot climate, it is better to choose reinforced fittings with a strength margin and adjustment. They are less prone to deformation, but the specific model depends on the profile and the weight of the sash.

Reviews of balcony glazing in Aktau

5,0based on 97 reviews on platforms
All reviews