Cold
Aluminium sliding frames against snow, leaves and rain. From 158 000 ₸ per balcony.


Cold
Aluminium sliding frames against snow, leaves and rain. From 158 000 ₸ per balcony.

Warm
PVC profile with double glazing for a living balcony. From 202 500 ₸ per balcony.

Extension
Frames on brackets outside the railing, wide window sill inside. From 214 000 ₸ per balcony.

Canopy
Roof over the glazing against rain and meltwater. From 49 000 ₸ per balcony.

Replacement
We remove old glazing before installing new frames. From 5 000 ₸ per balcony.

5,097 reviews on review sites
The choice depends on the building, floor and whether you need a warm balcony
Winters in Kokshetau are cold and snowy, so for a balcony room people choose PVC profile with double glazing. If the balcony is for storage and drying laundry, lightweight aluminium sliding frames are enough.
On narrow loggias of brick houses we make an extension, on the top floor of khrushchevkas — a canopy. We remove old wooden and draughty aluminium frames and replace them with new ones.

glazing per square metre
measuring and consultation
payment when the work is completed
Four situations we hear about most often

Snow and leaves on the floor. Cold aluminium glazing solves this at low cost.
We install PVC profile with double glazing, and insulate inside if desired.
Old frames don't close. We remove and install new ones.
Extended glazing adds space and a wide window sill.
From simple sliding frames to warm profile with extension
Aluminium

Protects from snow, wind and dust.
PVC · double glazing

For a living balcony all year round.
Wider by the window sill

More space on a narrow balcony.
Top floor

Protects frames from above against precipitation.
Inside · per m²

Walls, floor and ceiling for warm frames.
Prices per balcony, square or linear metre; final total after measuring
| Type of work | Price |
|---|---|
| Cold balcony glazing (aluminium)sliding aluminium frames | from 158 000₸ per balcony |
| Warm balcony glazing (PVC)PVC profile and double glazing | from 202 500₸ per balcony |
| Balcony glazing, per m²calculated by opening area | from 37 500₸ per m² |
| French (panoramic) glazingfloor-to-ceiling glass | from 322 500₸ per balcony |
| Balcony extensionextended to the window sill | from 214 000₸ per balcony |
| Balcony roof or canopyfor upper floors | from 49 000₸ per balcony |
| Removal of old glazingframe removal and disposal | from 5 000₸ per balcony |
| Exterior balcony claddingcorrugated sheet or siding | from 73 000₸ per balcony |
| Interior balcony insulationfor warm glazing | from 6 800₸ per m² |
| PVC window sill installationinside the balcony | from 5 500₸ per linear m |
| Sliding mosquito screen for balcony and loggiafor new frames | from 17 400₸ per m² |
| Drip sill installationwater drainage from the frame | from 3 250₸ per linear m |
Price fixed in the order after measuringMeasuring and consultation — freePayment after work: cash, card, Kaspi
Book a measurerWhat you get with your order
we work across Kazakhstan
on WhatsApp
at a convenient time
does not change after measuring
completion of work
no days off
mosquito screens for new glazing
cities of Kazakhstan
From request to acceptance

Send a photo and tell us what kind of balcony you want. We will reply and arrange a measuring visit.

The measurer inspects the slab and railing, suggests a profile, extension or canopy, and gives the order price.

We remove the old glazing, install new frames, drip sills and window sill, and seal the joints.

We check every sash and junction. Payment after acceptance.
Good to know
We handle balcony and loggia glazing in Kokshetau with our own installers, a free measuring visit and a price fixed in the order after measuring. We fit warm PVC or cold aluminium systems to your parapet and floor, back the work with a 5-year installation warranty and take payment only after installation.
The first decision for any balcony and loggia glazing kokshetau project is warm versus cold: that choice sets the profile, the glass unit and whether the room stays usable through a Kokshetau winter.
| Parameter | Warm system | Cold system |
|---|---|---|
| Frame material | PVC profile | Aluminium frame |
| Glazing | Multi-chamber glass unit | Single pane |
| Keeps out | Cold, noise, condensation | Wind and rain |
| Best for | Living space all winter | Unheated storage |
We match the profile to the opening, using PVC for warm glazing and slim aluminium where weight matters, and pick the glass unit by how warm you need the room to stay. Our hinged door screens come with Economy 32×10 mm or Prestige 42×17 mm profiles, and the measurer checks the window profile and floor before choosing fixings. A thicker multi-chamber unit cuts street noise as well as cold, so on a busy side of the building the extra chamber pays off more than extra frame depth. In our practice, the frame depth matters less than the number of chambers once the loggia sits above the third floor. Ask for the unit spec in writing before the order is fixed — swapping chambers later means reordering the whole sash.
The measuring visit is not a formality — it is the point where the construction, the fixings and the final order price are settled. Here is what happens before the workshop starts.
Our measurer comes at a convenient time, takes the sizes, checks the parapet and opening, and helps choose the design, glass unit and fixings, all free of charge. He notes the window profile, the sill depth and the floor level, because these decide which anchors hold the frame safely. On plastic, wooden and aluminium windows the fastening points differ, and a hinged door screen needs a sturdier anchor than a light window frame. We paint the screen frame any colour to match your windows, so the measurer also matches the shade on site. The fixing choice depends on the frame type and the floor, so a high flat may need different anchors than a ground-floor loggia even with identical units — mention the floor when you book, and the measurer brings the right brackets.
Coverage and payment are the two things a buyer checks before signing off on an order, and both are where a quote either holds up or falls apart. Here the terms are stated plainly.
| What is covered | Period | What it includes |
|---|---|---|
| Installation job | 5 years | The complete assembly |
| Glass unit swap | 3 years | New unit and its placement |
| Repair work | 1 year | Labour and replaced parts |
You settle up once the frames are in, by cash, card or Kaspi, and we answer on WhatsApp within 5 minutes, seven days a week. The price is fixed in the order after measuring, so the figure agreed at the visit is the figure you pay at handover — no revision appears afterwards. Our team works through weekends, which matters for glazing jobs in Kokshetau scheduled around a working week, and a question sent on a Sunday gets a reply the same day rather than on Monday. Settling on completion keeps the risk on us until the frames are in place, so any issue spotted during handover is resolved before money changes hands. Ask for the terms in writing at the measuring visit — the repair clock and the assembly clock run separately, and knowing which applies to your job prevents a dispute later.
The type of building and the condition of the parapet decide which construction will fit without problems, and where preparation comes first.
A worn or uneven parapet usually needs levelling or a reinforcing frame before glazing, and any extension beyond the existing slab has to be checked against the building first. On older blocks the top edge often sags by a few centimetres along its length, so a straight unit placed on it leaves gaps that no sealant closes for long. A steel reinforcing structure spreads the load and gives the anchors a true line to bite into. Where the loggia has been pushed out past the original slab, the added floor and roof carry real weight, and the fixings have to reach the load-bearing wall behind the cladding. On panel blocks this edge is often the weakest point, so the glazing is anchored to the solid slab and walls rather than to the low wall alone — ask for the fixing points to be marked before the profile goes up.
Even a correctly installed glazed balcony needs attention to seals and hardware, and most complaints we hear are solved by a simple adjustment rather than a rebuild.
Condensation and draughts usually come from a worn seal or a sash that has lost its press, and we replace the seal on windows of any maker, including KBE, Rehau, VEKA and Provedal. The rubber strip runs along the whole contour of the sash and does two jobs at once: it blocks cold air from blowing through the gap and keeps warm indoor moisture from settling on the frame edge. When the rubber flattens or hardens, the sash no longer presses evenly, and you see water on the pane in the morning plus a draught along the handle side. Hardware adjustment often restores the press without new parts. A warm loggia still fogs up if the room behind it is not ventilated, so a working vent or regular airing matters as much as the glazed assembly itself.
If only the glazing is failing, we can swap the sealed unit without full glazing, and urgent replacement is done within a day at a surcharge to the pane price. A fogged or cracked panel is changed inside the existing frame, so the parapet, panels and finishing stay untouched and the job is far smaller than a new installation. Winter installation is possible because the frames are made off-site and arrive ready, but sealing and finishing work is best scheduled for a milder day, when foam and sealant cure properly and the crew is not fighting frost at the opening. On cold-weather jobs we mount the frame first and return for the final sealing once the temperature allows. If a pane fails in January, book the replacement early and keep the old one until the new one arrives.
A final pass over the decisions that matter most, gathered into one short list you can check against your own balcony.
Extension, insulation, cold glazing, acceptance, double glazing replacement
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionAn extension is not always possible: first, the surveyor checks the condition of the slab and parapet, and if there are doubts, they suggest reinforcement. Without approval from the building, extending beyond the slab may be considered redevelopment, so details are discussed before ordering.
First, the frames are installed, and insulation of the parapet, floor, and ceiling is done afterwards, otherwise the fixings and seams remain exposed. If you want a warm balcony, it is better to discuss the order of work with the surveyor in advance.
No, these are different contours: aluminium frames without a thermal break do not retain heat, and wall insulation will not protect against cold and ice on the glass. If the balcony is planned to be warm, choose a PVC profile right away, otherwise it will have to be redone.
Open and close each sash, check smooth operation and tightness of the seal, inspect seams and reveals for gaps. If a sash catches the frame or there is a draft around the perimeter, report it immediately while the fitter is on site.
Yes, if the profile and hardware are in good condition, the old double glazing is replaced with new without dismantling the frames. Before work, the fitter checks whether the new double glazing matches in size and weight.
It cannot be determined by eye: an inspection of the slab and parapet by a specialist is needed to assess the condition of the concrete and fixings. If there are cracks or damage, reinforcement is recommended first, otherwise installation may be unsafe.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp