PVC window
Single-sash window with installation — from 42 500 ₸ per window. Double-sash — from 65 500 ₸.


PVC window
Single-sash window with installation — from 42 500 ₸ per window. Double-sash — from 65 500 ₸.

Wooden window
Replacement of old wooden frames with PVC: removal — from 1 800 ₸ per m², installation — from 4 650 ₸ per m².

Balcony unit
Window and door to balcony — from 95 500 ₸ per item. Installation to GOST — from 5 200 ₸ per m².

Double glazing
Double glazing replacement with 3-year warranty. Urgent production — within one day.

Reveals
Reveals from sandwich panels — from 4 700 ₸ per linear m. For standard window turnkey — from 15 000 ₸.

5,097 reviews on review sites
Window replacement includes removal of the old frame, installation of a new structure with double glazing, reveals, window sill and drip sill.
Window replacement includes removal of the old frame and sashes, installation of a new structure in the opening, installation to GOST with vapour and waterproofing of the seam, as well as reveal finishing, window sill and external drip sill installation. Work is performed on PVC, wooden and aluminium windows, including balcony units and loggias.
Typical replacement sites are a dacha with wooden frames, a nine-story panel building with windows from the 2000s, and a balcony in a new building. For each case, the technician selects the profile, double glazing and fixings for the wall material.

warranty on window installation
warranty on double glazing replacement
measuring visit and consultation
The frame is fixed in the opening with anchor plates or fixings into the wall, and the seam is filled with foam with vapour and waterproofing.

The frame is levelled and fixed in the opening with vapour and waterproofing of the seam — from 5 200 ₸ per m².
Fixings are selected for the wall material: plates for frame, anchors for brick and concrete.
Foam is covered with vapour barrier inside and waterproofing outside so the seam does not freeze.
In panel buildings, hollow slabs require selecting anchor length so the fixing does not hit a void.
PVC profile, wood and balcony unit differ in wall thickness, number of chambers, weight and maintenance requirements.
Apartment, house

Multi-chamber profile with fittings and seal, suitable for most openings.
Country house, old building

Replacement of old wooden frames with a new structure while keeping the opening dimensions.
Loggia, balcony

Window and balcony door in one set, installation to GOST with seam insulation.
Bedroom, kids' room

Coated double glazing retains heat in winter and reduces condensation on the glass.
House by the road

Thicker glass and different chamber widths dampen street noise in the apartment.
Price list for works and structures: dismantling, installation, windows, balcony block, window sill, drip cap, reveals and sealing.
| Type of work | Price |
|---|---|
| Dismantling of old windowremoval of old frame and sashes | from 1 800₸ per m² |
| Installation of PVC windowframe installation in the opening | from 4 650₸ per m² |
| Window installation to GOSTwith vapour and waterproofing of the seam | from 5 200₸ per m² |
| Single-sash PVC windowstructure with installation | from 42 500₸ per window |
| Double-sash PVC windowstructure with installation | from 65 500₸ per window |
| PVC window with installationturnkey | from 60 000₸ per m² |
| Balcony unit with doorwindow and door to balcony | from 95 500₸ per item |
| PVC window sill installationwindow sill after window replacement | from 5 500₸ per linear m |
| Drip sill installationexternal drip sill | from 3 250₸ per linear m |
| PVC revealssandwich panels | from 4 700₸ per linear m |
| Reveals for standard windowturnkey | from 15 000₸ per window |
| Sealing of external seamsseam sealing after installation | from 2 000₸ per linear m |
The price is fixed in the order after measuringMeasuring and consultation are freePayment after installation: cash, card or Kaspi
Request a measuring visitWarranty on installation — 5 years, on double glazing — 3 years. Measuring is free, the price is fixed in the order after measuring, payment after installation.
for window installation
for double glazing replacement
free and at a convenient time
after measuring
installation: cash, card or Kaspi
we work daily
production and replacement with surcharge
of Kazakhstan, including Taraz
From request to checking the finished window

The measurer will come at a convenient time, take the opening dimensions and help choose the profile and double glazing.

The structure is made to the measured dimensions, the price is fixed in the order before work begins.

The old frame is removed, the new one is installed to GOST with vapour and waterproofing of the seam, the window sill and drip cap are fitted.

The technician shows the finished window, checks the operation of sashes and fittings, and answers questions about profile care.
Good to know
We handle pvc window installation in Taraz with our own crews, not middlemen. A free measuring visit sets the size, profile, glass unit and fixings, the price is fixed in the order after measuring, and you pay only after installation by cash, card or Kaspi. Installation carries a 5-year warranty.
Measuring is not a formality — it is the point where dimensions, profile and fixings are settled. The visit costs nothing, and the measurer arrives at a time that suits you.
Our measurer comes free of charge, takes dimensions on site and helps choose the design, profile and fasteners, so the window is built to the real aperture rather than a rough estimate. He checks the reveal width and height at several points, the square of the existing structure, the wall material and the floor level, because a panel-house opening and a poured-concrete one take different anchors. He also looks at how the old frame sits and whether the sill needs replacing. A glazing measured from an old frame or a photo almost always comes out a few millimetres off, and that gap later shows up as a draught or a sticking sash. This is why pvc window installation taraz always starts with on-site measurement, not a guess.
On site the work follows one order: remove the old unit, prepare the opening, set the new one, check it and clear the space behind. Here is what happens at each stage.
You pay after installation, so check the finished window first — open and close each sash, look for gaps at the frame, and test the fittings before any money changes hands. Run a hand along the perimeter where the unit meets the wall: a draught means the foam or tape needs attention. Check that sashes sit flush, the handle turns without catching, and drainage slots underneath are open and not painted over. Payment is cash, card or Kaspi once you are satisfied. A sash that rubs or a handle that catches on day one is a fitting adjustment, not a fault to live with, and it is easier to sort while our crew is still on site.
Fixings and tolerances are what hold a window steady for years. Here is which fastener suits which opening, and why an older building asks for a different approach from a new one.
| Wall or opening | Fixing we use | Why it holds |
|---|---|---|
| Solid concrete | Frame anchors | Bite deep into dense material |
| Brick and block | Threaded frame screws | Grip without cracking the brick |
| Thin or hollow walls | Plate fixings | Spread the load over a wider area |
| Upper floors, windy side | Extra anchors plus plates | Resist pull-out from wind load |
In older buildings we remove the old window carefully, keep the opening edges intact and finish the outside so the facade stays clean rather than patched over. Khrushchevka-style panel and brick openings are rarely square, so the frame is set to the opening and packed to level instead of forcing the wall to fit the window. Our crews fit plastic, wooden and aluminium openings alike, and the outside slopes are sealed so rain runs off rather than into the wall. On upper floors the fixing choice matters more, because a bracket that sits fine at ground level can work loose where wind pressure is stronger. Ask the measurer to show how the old frame will come out before work starts — that step protects the facade and the neighbours' plaster.
Hot summers and cold winters put their own demands on a window here, and the right profile and glazing depend on which way the room faces and how noisy the street outside is.
| What the window faces | Profile | Glazing |
|---|---|---|
| Quiet courtyard, living room | 3-chamber PVC | Double, two panes |
| Busy street, bedroom | 3-chamber PVC | Double, wider air gap |
| Cold-facing wall | 5-chamber PVC | Double, edges checked |
| Sunny side, large glazing | 5-chamber PVC | Double, low-solar coating |
Most draughts and condensation come from a worn gasket or a badly set sash, and we replace the gasket in windows of any make, including KBE, Rehau, VEKA and Provedal. A strip flattened over several seasons lets cold air past the frame even when the handle is tight, and the sash then needs adjusting rather than replacing. Mist on the pane usually signals poor ventilation or a weak insulating unit, not a leak — tightening the frame without fixing airflow makes it worse. A well-made unit with a sound gasket and a properly set sash serves for decades, and the parts that wear first are the strip and fittings, not the frame.
Not every old window needs replacing. Sometimes an adjustment, a fresh seal or a new glass unit is enough, and the frame keeps serving for years. Here is how we decide.
If the frame is sound and only the sash rubs, the seal is worn or a glass unit has fogged, we repair and adjust the window instead of replacing it, with a 1-year warranty on labour and replaced parts. A rubbing sash usually needs the hinges reset and the corners tightened; a worn seal is swapped for a new rubber gasket; a fogged unit is measured and set into the existing frame within a day on urgent orders. The same visit can cover a window from any maker, including KBE, Rehau, VEKA and Provedal, since the seal stock fits all common profiles.
Direct work means clear terms: what is covered, for how long, and when money changes hands. Below are the warranty periods we put in writing, and how booking and payment actually run.
| Cover | Period |
|---|---|
| Window installation | 5 years |
| Glass unit replacement | 3 years |
| Window repair, labour and parts | 1 year |
| Mosquito screen | 1 year |
You book a free measuring visit by message, we reply on WhatsApp within 5 minutes and stay open seven days a week, and you pay after installation by cash, card or Kaspi. The measurer arrives at a time that suits you, takes the sizes and helps pick the profile, glass unit and fixings, so the order you sign matches what gets fitted. Nothing is charged up front: the price is fixed in the order after the survey and does not move unless you change the scope. Payment follows the finished job, once you have checked the window. Reserving the visit early leaves room to schedule the fitting around your building's rules and the weather — in our practice, autumn slots fill first.
A sound window comes down to a few practical decisions, and each one is settled before the new unit goes in. Here is what to keep in mind.
Double glazing, timelines, choice, fitting
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionYes, if the profile and hardware are in good order and the problem is only with the double glazing, it can be replaced separately. The technician will check the frame and advise whether that is enough or the window already needs a full replacement.
For one window, the technician removes the old unit, prepares the opening, installs the new one and foams the joint. The exact time depends on the window size and the condition of the opening; sometimes the reveals and finishing are completed separately.
For a frosty winter, a double-chamber double glazing with energy-saving coating and argon, and a warm edge spacer, is more sensible. Single-chamber units freeze more and cause condensation more often; the choice depends on the window and its orientation.
In a brick building, the opening is usually more even and the walls are denser, so fixing and foaming the joint are simpler. In a panel building, more attention is paid to the geometry of the opening and reliable fixings.
First, try adjustment and replacing the seal — that is often enough. If the frame is warped or the hardware is worn out, repair will not help and the window is replaced.
The sashes should open smoothly, without distortion, and there should be no draught around the perimeter. Check that the joints are foamed and closed, the reveals are secure, and the double glazing has no chips or scratches.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp