Craftsman by a new plastic window in the children's room
Price depends on configurationFree measuring visit, installation to GOST, 5-year warranty on workCalculate

PVC Window Installation in Temirtau

Single-leaf · PVC

Single-leaf

Compact window for the kitchen or bedroom, with installation — from 42 500 ₸ per window. Free measuring visit and consultation.

Technician holds a new white PVC window handle, showing the replacement
GoogleYandex MapsZoon

5,097 reviews on review sites

What PVC window installation in Temirtau includes

Removal of the old frame, installation of the new structure and sealing of joints — three key figures for budget planning.

How the service works

Window replacement is not just a new frame with double glazing. The work includes careful removal of the old structure with disposal, installation of the new frame in the opening, foaming and sealing of external joints, and adjustment of sashes and fittings after installation.

Reveal finishing, window sill and drip sill installation are separate works; you can order them now or later. The measuring visit and consultation are free, and the price is fixed in the order after measuring — before work begins.

New white PVC window in a bare wall opening, the joint at the wall filled with mounting foam
from 4 650 ₸/m²

standard installation of a PVC window

5 years

warranty on installation work

1 day

typical installation time for one window

to GOST
Vapour barrierWaterproofingAnchorsPlates

How PVC window fitting is performed in Temirtau

Installation to GOST with vapour and waterproofing, fixing with anchors or plates, and re-sealing of a freezing joint after someone else's installation.

Close-up of the installation joint: cured foam between the white PVC frame and the concrete opening
  • 01Installation to GOST

    The frame is levelled, the joint is filled with expanding foam with vapour and waterproofing. Price — from 5 200 ₸ per m².

  • 02Fixing with anchors

    Anchors go into the wall through the frame, providing rigid fixation. Suitable for panel and brick buildings.

  • 03Fixing with plates

    Flexible plates are attached to the wall outside the frame, hiding the fixings. Often used in wooden houses.

  • 04Re-sealing of the joint

    If a seam freezes after someone else's installation, the technician opens the old layer and re-seals it according to GOST. Price — from 2 000 ₸ per linear metre.

Types of PVC windows and glazing units to order

Five design options with price per window or per m²: single-leaf, double-leaf, balcony unit, bay window, and soundproof window.

Single-leaf

PVC · kitchen, bedroom

Technician holds a new white PVC window handle, showing the replacement

Compact window with one leaf, including installation — from 42 500 ₸ per window.

from 42 500 ₸

Double-leaf

PVC · living room, children's room

Technician holding a white PVC profile for a bay window

Standard window with an opening leaf, including installation — from 65 500 ₸ per window.

from 65 500 ₸

Balcony unit

PVC · balcony, loggia

A craftsman holds a white plastic window reveal panel for finishing in his hand

Window with a door to a balcony or loggia, including installation — from 95 500 ₸ per set.

from 95 500 ₸

Bay window

PVC · corner apartment

Technician fitting a white metal drip sill under a window during installation

Corner glazing of a protruding wall section, turnkey — from 60 000 ₸ per m².

from 60 000 ₸/m²

Soundproof

PVC · street with traffic

Hands holding a triple-glazed unit sample with a grey spacer frame: window noise insulation

Window with reinforced double glazing to reduce street noise, turnkey — from 60 000 ₸ per m².

from 60 000 ₸/m²

PVC window installation prices in Temirtau

The cost of work and structures is given per unit; the total amount is fixed in the order after measuring.

Type of workPrice
Installation of a PVC windowstandard installationfrom 4 650₸ per m²
Window installation to GOSTwith vapour and waterproofingfrom 5 200₸ per m²
Dismantling of old windowwith disposalfrom 1 800₸ per m²
Single-leaf PVC windowwith installationfrom 42 500₸ per window
Double-leaf PVC windowwith installationfrom 65 500₸ per window
PVC window with installationturnkeyfrom 60 000₸ per m²
Balcony block with doorwith installationfrom 95 500₸ per unit
PVC window sill installationstandard widthfrom 5 500₸ per linear metre
Drip sill installationwith sealingfrom 3 250₸ per linear metre
PVC reveals (sandwich panels)with installationfrom 4 700₸ per linear metre
Reveals for a standard window, turnkeywith materialfrom 15 000₸ per window
Sealing of external jointsafter installationfrom 2 000₸ per linear metre

Price is fixed in the order after measuringMeasuring and consultation are freePayment after installation: cash, card or Kaspi

Book a free measuring visit

Why customers order PVC windows from us in Temirtau

5-year installation warranty, free measuring, price fixed after measuring, and payment after installation.

Installation warranty5 years

for window installation work

Measuringfree

the measurer will come at a convenient time and take the measurements

Price fixingafter measuring

painting the profile to match window colour (white, brown, grey)

Payment after installation3 methods

urgent double glazing production with surcharge

Order acceptancedaily

you can place an order any day of the week

Double glazing warranty3 years

for double glazing replacement

Urgent replacementsame day

urgent double glazing production with surcharge

Coverage17 cities

you can order windows in 17 cities of Kazakhstan

How PVC window installation is carried out in Temirtau

From request to finished window — four steps

  1. A hand holds a smartphone with a dark screen by a white PVC window in a bright room
    011 day

    Measuring

    The measurer arrives at a convenient time, takes the dimensions of the opening and helps choose the design.

  2. A tape measure measures the opening of a white PVC window in a bright room with warm walls
    021–3 days

    Production

    The window is made to individual dimensions. The timeframe depends on the profile and double glazing.

  3. A worker's hands work with the lower profile of a white PVC window frame on the sill
    031 day

    Removal and installation

    The old frame is removed with disposal, the new one is installed according to GOST with seam sealing.

  4. A finished white PVC window with a clean sill and reveals in a bright room
    041 day

    Finishing

    The window sill, drip and reveals are installed, then the leaves are adjusted.

Good to know

PVC Window Installation in Temirtau from Our Own Crews with a 5-Year Warranty

We handle pvc window installation in Temirtau with our own crews, not subcontractors. A free measuring visit sets the size, profile and fixings, the price is fixed in the order after measuring, and you pay only after installation by cash, card or Kaspi. Every fitting carries a 5-year warranty.

How pvc window installation temirtau starts with a free measuring visit

A site check is not a formality but the point where the size, profile, glass unit and fixings are decided and the price is locked. It costs nothing and happens at a time that suits you.

What the measurer checks and why the trip is free

Our measurer comes at a time that suits you, takes the dimensions of the aperture, checks the frame and the floor, and helps you choose the design, glass unit and fasteners, and the trip costs nothing. Consultation on site is free because the numbers taken there decide everything that follows: the frame dimensions, the sash opening direction, the sill width and the anchors that will hold the frame. The specialist also looks at the wall material and the condition of the old aperture, since a panel block, brick and timber each need a different fixing depth. This is how pvc window installation temirtau begins: the measurements taken here set the size and the price. A wrong size is the most common reason a finished window will not sit tight, so this stage matters more than the brand of the sections you pick later.

Fixing the price and paying after installation

We lock the price in the order right after the site check, so the figure you agree to is the figure you pay, and settlement happens once the work is done by cash, card or Kaspi. The paperwork lists the sections, the glass unit, the fittings and the fitting itself, and no extra line appears once the job starts. Because the sum is fixed before any material is cut, a change of mind at this stage costs you zero, while changes later, when production is already running, usually mean a fresh contract. Paying once everything is installed also gives you a chance to walk through the flat, open every sash and check the seals before you settle, and our crews work seven days a week so the job can be booked for a day off.

Repair, a new glass unit or full pvc window installation

Not every old window needs to be replaced. We first look at what has actually failed — the seal, the glazing, the hardware or the profile itself — and let that decide the work.

Three outcomes and what decides between them

Which fault leads to which kind of work
What is wrongWhat we doWarranty
Worn seal, stiff handle, draught at the sashRepair and adjustment1 year on labour and parts
Cracked or fogged glazing, frame still solidNew glass unit in the existing frame3 years
Warped or cracked frame, rotten jointsFull window replacement5 years on installation

What happens to the slopes and the windowsill

Slopes and the sill are part of the window assembly, so on a full replacement we fit new ones, while on a repair or glazing swap the existing ones usually stay. When only the glazing is changed, the reveal and the sill are never opened, so the finish around the window is left as it was. On a full swap the old frame comes out, the opening is cleaned back to the wall, and fresh slopes and sill are set and sealed against the new profile — that is the stage where the joint between window and wall is actually closed. Reusing a sill cut for the old frame often leaves a cold bridge underneath, which shows up as condensation in the first cold snap. If the sill is sound, ask the crew to check its level and foam the gap before the new window goes in.

Choosing a profile and glass unit for a Temirtau panel block

The glazing and the profile section are chosen for the building type and the side the window faces, not by the rule "the thicker the better". A panel block and a brick house call for different logic.

Matching the profile and glass unit to the building

For a panel block we lean on a multi-chamber profile and a two-glass unit to hold warmth through the local winter, while a brick or timber house often allows a slimmer section with the same result. Panel walls sit on a concrete skeleton that moves little, so the frame can be anchored rigidly and sealed in one pass; brickwork and wood shift with moisture and temperature, and there the fixing leaves the wall room to settle. A north-facing window gains most from a wider chamber count and a low-emission coating on the inner pane, while a south side already collects solar heat and needs less. The chamber count matters less than how well the frame is fixed and sealed into the wall, so a top section fitted loosely loses to a simpler one set correctly.

PVC windows in a timber house and how long they last

A plastic window can go into a timber house, but the wall needs a proper casing and room to settle, and with correct fitting the glazing serves for decades. We set the frame into a wooden box rather than straight into the logs, then anchor it so the structure can shrink and swell without pressing on the sashes. Anchors and mounting foam hold the unit in place, yet the foam alone never carries weight: the load goes to the anchors, and the foam closes the gap against draughts and damp. Hardware, seals and the glazed panel wear faster than the frame itself, and each can be renewed without touching it. In a timber wall the window should not carry the load of the building, so the fixing is planned to let the wall move without pinching the sash.

How pvc window installation runs on site and how to check the result

On site the work moves in clear steps, from taking out the previous unit to adjusting the sashes and cleaning up. Handover happens the same day, while everything is still fresh and easy to inspect.

From removal to clean-up, step by step

  • Removal: the old unit comes out first, and only when the opening is sound enough to take a new one.
  • Setting the new one: it goes onto anchors and foam, checked for level before the foam sets.
  • Fitting the sash: it goes back in, and we set hinges and locking points so it closes evenly.
  • Sealing: the gap around the perimeter is filled and the outside reveal is closed against water.
  • Cleaning up: offcuts, worn seals and residue leave with us, and floors are wiped at the end.
  • Handover: you walk the window with the crew, and the removed parts go out with them.

How to accept the work and spot a poor fitting

On the day, open and close every sash, check for draught around the perimeter and under the sill, and look at the seals, and if air moves where it should not, the fitting is not finished. Run a hand along the joint and the sill line, since a cold strip there shows up faster than a draught you feel standing still. We adjust the sashes after the fitting, and the hardware should turn without force and hold the leaf tight at every locking point. In a flat block, check that the new unit sits level with the opening and that the outside reveal is sealed, because a gap there lets water track back under the sill. A draught under the windowsill usually points to a gap in the foam line rather than the window itself, so it is worth flagging before the crew leaves rather than after.

Warranty, timing and window safety after the fitting

Once the frames are in, three practical questions remain: what the warranty covers, how long future work takes, and how to make the sashes safe for children. Each has a concrete answer before you sign off.

What the warranty covers and how long the work takes

Window installation carries a 5-year warranty, a glass unit swap 3 years and a repair 1 year on both labour and replaced parts. A single window is fitted in a few hours, and cold-weather fitting is normal when the foam and seals are rated for low temperatures. Our crews work through winter rather than pausing until spring, because a draughty window left in place loses heat all season. We reply on WhatsApp within five minutes and are open seven days a week, so a failed seal or a sticking frame is logged and scheduled quickly. Waiting for spring rarely improves the result — in our practice it usually delays a draughty window through the worst months.

Child safety, restrictors and locks on the windows

  • Restrictors: limit how wide the sash swings, letting air in while keeping the gap too narrow for a child to pass.
  • Blockers: hold the handle in a tilted or partly unfastened position so the window cannot be pushed further by a leaning child.
  • Key locks: add a removable key to the handle, useful on ground floors and in rented flats where access stays controlled.
  • Fixing point: hardware is matched to the profile and the opening direction, then screwed into the reinforced frame rather than the plastic skin.
  • Ventilation check: after fitting, we test that the window still closes flush and the seal is not pinched by the new part.

What to consider before ordering window replacement

A short recap of what shapes a window project in this city, from the first measuring visit to the day the warranty runs out.

  • Free measuring first: the measurer checks the openings, helps choose the profile, unit and fixings, and the price is fixed in the order afterwards.
  • Three possible outcomes: repair, a replacement unit or full installation — the state of the frame and sashes decides which one applies.
  • Match the build: panel blocks, timber houses and upper floors call for different profiles, panes and fastening types.
  • Check the work on site: level, square, foam line and how the sashes close tell you more than any promise.
  • Warranty as the last filter: ask what it covers and for how long before signing, not after the crew leaves.

Questions about PVC window installation in Temirtau

Replacement or repair, installation, double glazing, dismantling

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01How is window replacement different from repair?

Replacement means removing the old frame and sashes and installing a new structure, while repair involves adjusting, replacing the seal or double glazing in the existing window. Replacement is needed when the profile is worn or damaged, whereas repair extends the life of a still sturdy window.

02How can I tell if my window can no longer be repaired and needs replacement rather than adjustment?

If the profile is cracked, the frame geometry is compromised, or the hardware has long been discontinued, repair will only give a temporary effect. In other cases, it's worth first trying adjustment and seal replacement, and then deciding based on the result.

03How does window replacement go in a panel building, and will the reveals and windowsill be damaged?

The old window is dismantled carefully, but the reveals and windowsill most often need to be renewed because the old ones no longer fit back in place. The technician warns in advance what can be preserved and what will be replaced.

04Where do I start with replacing old wooden windows with plastic ones, and what should I ask the measurer?

Start with a free measuring visit: the technician will take dimensions and suggest a design for your opening and building. Ask about the profile, double glazing, reveals, and windowsill, as well as what is included in the fitting and how the opening will be closed.

05How does window replacement go in winter, and will the apartment get too cold?

Installation is done quickly, using a heat curtain or temporary insulation. The apartment doesn't have time to cool down, and the mounting foam and sealant work at sub-zero temperatures.

06Which double glazing is best to install to avoid condensation in winter?

For a cold climate, double-chamber double glazing with energy-saving coating and argon is recommended. They reduce the risk of condensation and retain heat better.

07Can old frames and glass be left behind after window replacement?

The old structure is dismantled and taken out on the day of installation so it doesn't get in the way in the apartment. Clarify with the measurer in advance exactly how it will be removed and disposed of — this is discussed before work begins.

Reviews of PVC window installation in Temirtau

5,0based on 97 reviews on platforms
All reviews