Craftsman by a new three-sash PVC window in a studio living room
from 42 500 ₸ per windowFree measuring, installation to GOST with seam insulation.Calculate

PVC Window Installation in Aktobe

Bedroom · PVC

Single-leaf

Compact window for bedroom or kitchen — from 42 500 ₸ per item made to your dimensions.

Technician holds a new white PVC window handle, showing the replacement
GoogleYandex MapsZoon

5,097 reviews on review sites

What is PVC window installation

Window replacement means removing the old frame and installing a new unit with double glazing and hardware.

How it works

A window consists of a frame, sashes, double glazing and hardware. During replacement, the old unit is removed, the opening is prepared and a new structure is installed with seam insulation.

Typical situations for replacement: old wooden windows are changed to PVC, windows in new buildings with profile defects, balcony units from the 2000s. In each case, the specialist assesses the condition of the opening and selects a structure for the specific task.

New white PVC window in a bare wall opening, the joint at the wall filled with mounting foam
from 42 500 ₸

single-leaf window made to your dimensions

5 years

warranty on window installation

1 day

removal and installation in one day

5 years
PVCWoodAluminiumBay windowBalcony

How window installation is performed

The frame is fixed to the opening with anchors or mounting plates, and the seam is filled with vapour and waterproofing.

Close-up of the installation joint: cured foam between the white PVC frame and the concrete opening
  • 01Anchor fixing

    The frame is fixed with anchors through the profile into the wall. Suitable for panel and brick buildings with a solid base.

  • 02Mounting plates

    Plates are fixed to the frame and wall, hiding the fixings under the reveals. This method is convenient for wooden and frame walls.

  • 03Seam insulation

    The seam is filled with expanding foam, protected outside with waterproofing and inside with vapour barrier. This reduces draughts and freezing.

  • 04Reinstallation in case of freezing

    During reinstallation, the old frame and double glazing are removed, the geometry of the opening and condition of the base are checked. Fixings are selected for the wall material: anchors for solid bases, mounting plates for frame walls.

Types of PVC window structures for installation

A window is selected by the number of sashes, type of profile and double glazing: one sash is enough for a bedroom, two for a living room, and a balcony unit is needed for access to the loggia.

Single-leaf

PVC · tilt-and-turn

Technician holds a new white PVC window handle, showing the replacement

A compact window for the bedroom, kitchen or kids' room. One sash opens to air the room.

from 42 500 ₸

Two-sash

PVC · two sashes

Hands holding a triple-glazed unit sample with a grey spacer frame: window noise insulation

More light and easy ventilation. Suitable for living rooms and spaces with a wide opening.

from 65 500 ₸

Balcony unit

Window and door as a set

Technician holding a white PVC profile for a bay window

A ready-made set for access to a loggia or balcony. The door and window are fitted in one opening.

from 95 500 ₸

Bay window

Several sashes at an angle

A craftsman holds a white plastic window reveal panel for finishing in his hand

A structure of several frames for a projecting opening. Gives a panoramic view and more light.

from 60 000 ₸/m²

With fitting

Product and installation together

Technician fitting a white metal drip sill under a window during installation

A window with GOST-compliant fitting and seam insulation. The price includes the product and installation work.

from 60 000 ₸/m²

PVC window installation prices in Aktobe

The price list covers removal, fitting and finishing of the opening, as well as ready-made products.

Type of workPrice
Dismantling of old windowremoval and disposal of framefrom 1 800₸ per m²
Installation of PVC windowbasic installation in openingfrom 4 650₸ per m²
Window installation to GOSTwith vapour and waterproofing of seamfrom 5 200₸ per m²
Single-leaf PVC windowmade to your dimensionsfrom 42 500₸ per window
Double-leaf PVC windowmade to your dimensionsfrom 65 500₸ per window
PVC window with installationproduct and fitting togetherfrom 60 000₸ per m²
Balcony unit with doorwindow and door as a setfrom 95 500₸ per item
PVC window sill installationwindow sill and fixingsfrom 5 500₸ per linear m
Drip sill installationexternal drip sill under windowfrom 3 250₸ per linear m
PVC reveals from sandwich panelsinternal finishing of openingfrom 4 700₸ per linear m
Reveals for standard window turnkeyfull finishing of openingfrom 15 000₸ per window
Sealing of external seamsprotection of seam from draughtsfrom 2 000₸ per linear m

The price is fixed in the order after measuring.Measuring and consultation are free.Payment after fitting: cash, card or Kaspi.

Calculate window replacement

Why customers order window installation from us in Aktobe

Warranty periods vary by type of work: fitting, double glazing and repair are covered separately — ask when ordering.

Warranty on fitting5 years

for window installation work

Measuring and consultation0 ₸

the surveyor will come at a convenient time

Price fixedin the order

the price does not change after measuring

We workseven days a week

daily 09:00–22:00

Warranty on double glazing3 years

for replacement of double glazing

Warranty on repair1 year

for work and replaced components

Coverage17 cities

you can order windows in 17 cities of Kazakhstan

Paymentafter fitting

cash, card or Kaspi

How PVC window installation is carried out in Aktobe

From request to finished window — four steps.

  1. A hand holds a smartphone with a dark screen by a white PVC window in a bright room
    01within 5 minutes

    Request

    Leave a request or message us on WhatsApp — we will reply within 5 minutes and agree a measuring time.

  2. A tape measure measures the opening of a white PVC window in a bright room with warm walls
    02at a convenient time

    Measuring

    The surveyor measures the width and height of the opening, the depth of the reveal, checks the wall geometry and records the results in the order form.

  3. A worker's hands work with the lower profile of a white PVC window frame on the sill
    03by agreement

    Manufacturing

    The window is made to your dimensions. Lead times depend on the structure and are agreed when ordering.

  4. A finished white PVC window with a clean sill and reveals in a bright room
    04in one day

    Fitting

    The technician removes the old frame, prepares the opening, installs the new window and takes away the debris after work.

Good to know

PVC Window Installation in Aktobe from Our Own Crews with a 5-Year Warranty

We handle pvc window installation aktobe as a direct contractor, not an agency: our own measurer visits for free, our crews remove the old frame and fit the new one, and you pay only after installation. Every fitting carries a 5-year workmanship warranty, and we work seven days a week.

How pvc window installation aktobe starts with a free measuring visit

A measuring appointment is the point where an order stops being approximate and becomes exact. Here is what the measurer does, what our crews handle on the day and how long the job takes.

What the measurer checks and why the appointment costs nothing

Our measurer comes at a time that suits you, takes the opening sizes and helps you choose the design, profile and fixings, and the appointment itself is free. He records width, height and depth at three points on each side, checks the reveal for level and square, and notes the wall material, floor level and sill overhang. The profile and hardware are matched to those numbers on the spot, so the quote you get is the quote you sign. A size taken by eye from the previous frame is the most common reason a new sash binds or leaves a draught gap, so the measurement is taken on the bare aperture, not on the unit being replaced. This is how pvc window installation aktobe begins: with exact numbers rather than estimates.

How long the work takes and what happens to your old window

We remove the old frame, fit the new one and adjust the hardware in a single day, and you can stay in the flat while our crews work. Demolition, foam, levelling and the sill go into the same shift, and the workers take the dismantled unit and glass away with them. Our own installers handle window installation in Aktobe in panel and brick blocks across the city, so nobody hands your aperture to a subcontractor halfway through. Ask the workers to lay down protection before demolition starts, because foam and plaster dust settle everywhere and are far easier to contain than to clean afterwards.

Choosing a profile, glass unit and fixings for the Aktobe climate

Three decisions shape how a window handles a frosty winter and steady wind: the profile, the glass unit and the way the frame is fixed. We take each one in turn.

Profile and glass unit options side by side

Matching frame and glazing choices to rooms and budget
OptionWhat it suitsWhat to know
Economy profileStandard openings, tighter budgetSlimmer build, fine for most flats
Prestige profileLarger sashes, colder roomsDeeper section, more room for thicker glazing
Single-chamber glazingMild rooms, interior partitionsLighter, less insulation
Double-chamber glazingLiving rooms facing the windHeavier, better heat retention

Anchors or mounting plates and how the floor decides

Our measurer picks the fixing to match the window profile and the floor, choosing between Z-shaped brackets, pins or anchors rather than using one method everywhere. A panel-block flat and a brick house hold a frame differently, and the pattern changes again on upper floors of a high-rise, where the wind load on a large sash is far higher than at ground level. The fixing pattern matters more than the fastener brand, and it should be agreed before the frame goes in. On upper floors we plan the anchor spacing around the sash size, not around habit, because a wide opening catches wind that a narrow one never sees. Ask what the crew will use before the frame arrives, and note it in the order after measuring so nothing changes on the day.

How pvc window installation runs on site from demolition to clean-up

On site, the work is a chain where each step holds the next one in place. Here is the order our crews follow and what to check before they pack up and leave.

The order of work inside the opening

  • Demolition: the old sash and frame come out and the opening is cleaned back to solid wall.
  • Setting: the new frame is levelled and wedged before any fixing is driven home.
  • Foaming and sealing: the joint is filled and closed with a vapour barrier on the warm side.
  • Finishing: sill, slopes and flashing go on so water runs away from the wall.
  • Adjustment: hinges and locks are set so the leaf closes evenly on all sides.

What to check before the crew leaves

Open and close each leaf, run a hand around the seal and check that the frame sits square in the opening before you sign off the work. We hand over only after the hardware has been adjusted and the leaf moves without catching anywhere. Look along the sill and slopes: a straight line against the wall shows the frame went in level, and a gap at a corner means the foam or the barrier was rushed. A sheet of paper trapped in the closed leaf should resist a steady pull all the way round; if it slides out easily at one corner, the hardware needs adjusting now, not after the first cold snap. Ask the crew to show you the drainage slots under the leaf before they go — blocked or painted-over slots are the usual cause of water on the sill after heavy rain.

Repair, a new glass unit or full pvc window installation

Not every fogged or drafty window needs to be torn out and replaced. We separate three cases — a hardware adjustment, a new sealed unit, and complete installation in Aktobe — and the condition of the frame decides which one applies.

When adjustment or a seal swap is enough

If the frame is sound and the sash still closes, a hardware adjustment or a fresh seal usually solves a draught, and we replace seals on windows of any make, including KBE, Rehau, VEKA and Provedal. A sash that rubs, a handle that needs a push, or a thin whistle along the hinge side points to worn hardware rather than a dead window. On aluminium loggia glazing the same rule holds: the rubber and the rollers go first, the aluminium stays. Rubber hardens on a schedule of its own, so a window that drafts every third winter is telling you about the gasket, not about the sash. Ask for the brand by name before work starts, because a cheap strip flattens within two seasons.

When only the glass unit or the whole window has to go

A cracked or fogged pane is replaced on its own, and we can make and fit a fresh sealed unit within a day at a surcharge, while a warped or rotten profile means full replacement. Condensation trapped between the panes is the signature of a failed seal around the spacer, and no amount of cleaning brings the clarity back. A frame that has gone out of square, shows rot at the sill, or cannot hold a screw after two attempts will not be saved by new glass. Fog between the panes means the sealed unit has failed, not the frame, so replacing the glass restores clarity without touching the walls or the finishing. Check the sill line with a level before you agree to a full swap, since a sound profile with a bad unit is the cheaper path.

Warranty, payment and booking process

Warranty terms and the payment order are the last things a buyer checks before confirming a job. Below are the cover we give, what falls outside it, and the steps from a first message to the bill.

What the warranty covers and what it does not

We give a 5-year warranty on window installation, 3 years on a replaced glass unit and 1 year on window repair covering both labour and the parts we fit. The installation cover follows the whole assembly, so a sash that starts catching or a frame that shifts is ours to correct. On a repair call the year applies to the new seal, hinge or handle and to the work that put it in. Wear parts you damage yourself — a cracked pane from a football, a bent handle from forcing a lock — sit outside the terms, and we say so at the visit, not after the invoice. A draught or condensation reported in the first season is treated as a service call, so log it early with the date and the room rather than waiting for the next winter.

How to book a visit and when you pay

Message us on WhatsApp and we reply within five minutes, we work seven days a week, and you pay after installation by cash, card or Kaspi once the price is fixed in the order after measuring. The crews that arrive are our own, not teams picked up for the day, so the person who measures answers to the same people who fit the frame. The measurer brings the samples, so the profile and glass unit choice happens at your window rather than over the phone. Booking the measuring visit before comparing quotes gives you a fixed figure to compare against, because a price agreed before the opening is measured is only an estimate.

What determines the result of fitting a new window

A short recap of what keeps a window performing for years, from the first visit to the moment you sign off on the finished opening.

  • Measure first: a free measuring visit turns an estimate into a fixed order and prevents a sash that binds against its surround.
  • Match the parts: profile, glass unit and fixings are chosen together for the climate and the floor, not one at a time.
  • Watch the joint: the vapour barrier on the warm side of the foam decides whether the opening stays dry through winter.
  • Check before sign-off: every sash should close evenly and trap a sheet of paper all the way round the seal.
  • Know the rule: a sound surround calls for adjustment or a fresh seal, a failed unit takes new glass, while a warped frame means full replacement.

Questions about PVC window installation in Aktobe

Double glazing, adjustment, fitting, selection

Konstantin SelenenkovKonstantin Selenenkovsenior mosquito screen specialist, 10 years in the trade

Online · replies within 5 minutes

Ask a question
01Can I replace just the double glazing and keep the old frame?

Yes, if the profile and hardware are in good condition, the double glazing can be replaced without removing the frame — this is faster than a full replacement. But if the seam is freezing or the seal is worn, replacing the double glazing alone won't solve the problem.

02If there's a draft from under the sash, does the window need replacing or can it be adjusted?

Most often it's enough to adjust the hardware and replace the seal if the frame and sash are intact. A replacement is needed when there's a draft along the fitting seam, the profile is warped, or the sash geometry is compromised.

03What's the difference between replacing windows in a panel building and a private house?

In a panel building the opening is usually standard and even, while in a private house the walls can be thicker and uneven, so the fixings and seam insulation are chosen based on the wall material. The exact fitting method is determined by the free measuring visit on site.

04How can I check the quality of window fitting after installation?

Inspect the seam around the frame perimeter — it should be filled and sealed, the sashes should close tightly without distortion or drafts. Check that the windowsill is level and there are no gaps under the reveals.

05Do I need to move furniture and take down curtains before replacing windows?

Moving furniture out is not necessary, but it's better to move it away from the window and cover it with film, and take down the curtains — dust and small debris fly during removal. This keeps the room cleaner and gives the fitters more space to work.

06How to choose double glazing for an apartment in Aktobe considering wind and dust?

For Aktobe's windy and dusty climate, a double-chamber double glazing with energy-saving coating and a tight seal is chosen, and on a noisy street sound-insulating glass is added. The specific configuration is selected during the free measuring visit.

Reviews of window installation in Aktobe

5,0based on 97 reviews on platforms
All reviews