Single-leaf
Compact window for bedroom or kitchen — from 42 500 ₸ per item made to your dimensions.


Single-leaf
Compact window for bedroom or kitchen — from 42 500 ₸ per item made to your dimensions.



Bay window
Several sashes at an angle — installation to GOST from 5 200 ₸ per m².

With installation
Product and installation together — from 60 000 ₸ per m² of finished window.

5,097 reviews on review sites
Window replacement means removing the old frame and installing a new unit with double glazing and hardware.
A window consists of a frame, sashes, double glazing and hardware. During replacement, the old unit is removed, the opening is prepared and a new structure is installed with seam insulation.
Typical situations for replacement: old wooden windows are changed to PVC, windows in new buildings with profile defects, balcony units from the 2000s. In each case, the specialist assesses the condition of the opening and selects a structure for the specific task.

single-leaf window made to your dimensions
warranty on window installation
removal and installation in one day
The frame is fixed to the opening with anchors or mounting plates, and the seam is filled with vapour and waterproofing.

The frame is fixed with anchors through the profile into the wall. Suitable for panel and brick buildings with a solid base.
Plates are fixed to the frame and wall, hiding the fixings under the reveals. This method is convenient for wooden and frame walls.
The seam is filled with expanding foam, protected outside with waterproofing and inside with vapour barrier. This reduces draughts and freezing.
During reinstallation, the old frame and double glazing are removed, the geometry of the opening and condition of the base are checked. Fixings are selected for the wall material: anchors for solid bases, mounting plates for frame walls.
A window is selected by the number of sashes, type of profile and double glazing: one sash is enough for a bedroom, two for a living room, and a balcony unit is needed for access to the loggia.
PVC · tilt-and-turn

A compact window for the bedroom, kitchen or kids' room. One sash opens to air the room.
PVC · two sashes

More light and easy ventilation. Suitable for living rooms and spaces with a wide opening.
Window and door as a set

A ready-made set for access to a loggia or balcony. The door and window are fitted in one opening.
Several sashes at an angle

A structure of several frames for a projecting opening. Gives a panoramic view and more light.
Product and installation together

A window with GOST-compliant fitting and seam insulation. The price includes the product and installation work.
The price list covers removal, fitting and finishing of the opening, as well as ready-made products.
| Type of work | Price |
|---|---|
| Dismantling of old windowremoval and disposal of frame | from 1 800₸ per m² |
| Installation of PVC windowbasic installation in opening | from 4 650₸ per m² |
| Window installation to GOSTwith vapour and waterproofing of seam | from 5 200₸ per m² |
| Single-leaf PVC windowmade to your dimensions | from 42 500₸ per window |
| Double-leaf PVC windowmade to your dimensions | from 65 500₸ per window |
| PVC window with installationproduct and fitting together | from 60 000₸ per m² |
| Balcony unit with doorwindow and door as a set | from 95 500₸ per item |
| PVC window sill installationwindow sill and fixings | from 5 500₸ per linear m |
| Drip sill installationexternal drip sill under window | from 3 250₸ per linear m |
| PVC reveals from sandwich panelsinternal finishing of opening | from 4 700₸ per linear m |
| Reveals for standard window turnkeyfull finishing of opening | from 15 000₸ per window |
| Sealing of external seamsprotection of seam from draughts | from 2 000₸ per linear m |
The price is fixed in the order after measuring.Measuring and consultation are free.Payment after fitting: cash, card or Kaspi.
Calculate window replacementWarranty periods vary by type of work: fitting, double glazing and repair are covered separately — ask when ordering.
for window installation work
the surveyor will come at a convenient time
the price does not change after measuring
daily 09:00–22:00
for replacement of double glazing
for work and replaced components
you can order windows in 17 cities of Kazakhstan
cash, card or Kaspi
From request to finished window — four steps.

Leave a request or message us on WhatsApp — we will reply within 5 minutes and agree a measuring time.

The surveyor measures the width and height of the opening, the depth of the reveal, checks the wall geometry and records the results in the order form.

The window is made to your dimensions. Lead times depend on the structure and are agreed when ordering.

The technician removes the old frame, prepares the opening, installs the new window and takes away the debris after work.
Good to know
We handle pvc window installation aktobe as a direct contractor, not an agency: our own measurer visits for free, our crews remove the old frame and fit the new one, and you pay only after installation. Every fitting carries a 5-year workmanship warranty, and we work seven days a week.
A measuring appointment is the point where an order stops being approximate and becomes exact. Here is what the measurer does, what our crews handle on the day and how long the job takes.
Our measurer comes at a time that suits you, takes the opening sizes and helps you choose the design, profile and fixings, and the appointment itself is free. He records width, height and depth at three points on each side, checks the reveal for level and square, and notes the wall material, floor level and sill overhang. The profile and hardware are matched to those numbers on the spot, so the quote you get is the quote you sign. A size taken by eye from the previous frame is the most common reason a new sash binds or leaves a draught gap, so the measurement is taken on the bare aperture, not on the unit being replaced. This is how pvc window installation aktobe begins: with exact numbers rather than estimates.
We remove the old frame, fit the new one and adjust the hardware in a single day, and you can stay in the flat while our crews work. Demolition, foam, levelling and the sill go into the same shift, and the workers take the dismantled unit and glass away with them. Our own installers handle window installation in Aktobe in panel and brick blocks across the city, so nobody hands your aperture to a subcontractor halfway through. Ask the workers to lay down protection before demolition starts, because foam and plaster dust settle everywhere and are far easier to contain than to clean afterwards.
Three decisions shape how a window handles a frosty winter and steady wind: the profile, the glass unit and the way the frame is fixed. We take each one in turn.
| Option | What it suits | What to know |
|---|---|---|
| Economy profile | Standard openings, tighter budget | Slimmer build, fine for most flats |
| Prestige profile | Larger sashes, colder rooms | Deeper section, more room for thicker glazing |
| Single-chamber glazing | Mild rooms, interior partitions | Lighter, less insulation |
| Double-chamber glazing | Living rooms facing the wind | Heavier, better heat retention |
Our measurer picks the fixing to match the window profile and the floor, choosing between Z-shaped brackets, pins or anchors rather than using one method everywhere. A panel-block flat and a brick house hold a frame differently, and the pattern changes again on upper floors of a high-rise, where the wind load on a large sash is far higher than at ground level. The fixing pattern matters more than the fastener brand, and it should be agreed before the frame goes in. On upper floors we plan the anchor spacing around the sash size, not around habit, because a wide opening catches wind that a narrow one never sees. Ask what the crew will use before the frame arrives, and note it in the order after measuring so nothing changes on the day.
On site, the work is a chain where each step holds the next one in place. Here is the order our crews follow and what to check before they pack up and leave.
Open and close each leaf, run a hand around the seal and check that the frame sits square in the opening before you sign off the work. We hand over only after the hardware has been adjusted and the leaf moves without catching anywhere. Look along the sill and slopes: a straight line against the wall shows the frame went in level, and a gap at a corner means the foam or the barrier was rushed. A sheet of paper trapped in the closed leaf should resist a steady pull all the way round; if it slides out easily at one corner, the hardware needs adjusting now, not after the first cold snap. Ask the crew to show you the drainage slots under the leaf before they go — blocked or painted-over slots are the usual cause of water on the sill after heavy rain.
Not every fogged or drafty window needs to be torn out and replaced. We separate three cases — a hardware adjustment, a new sealed unit, and complete installation in Aktobe — and the condition of the frame decides which one applies.
If the frame is sound and the sash still closes, a hardware adjustment or a fresh seal usually solves a draught, and we replace seals on windows of any make, including KBE, Rehau, VEKA and Provedal. A sash that rubs, a handle that needs a push, or a thin whistle along the hinge side points to worn hardware rather than a dead window. On aluminium loggia glazing the same rule holds: the rubber and the rollers go first, the aluminium stays. Rubber hardens on a schedule of its own, so a window that drafts every third winter is telling you about the gasket, not about the sash. Ask for the brand by name before work starts, because a cheap strip flattens within two seasons.
A cracked or fogged pane is replaced on its own, and we can make and fit a fresh sealed unit within a day at a surcharge, while a warped or rotten profile means full replacement. Condensation trapped between the panes is the signature of a failed seal around the spacer, and no amount of cleaning brings the clarity back. A frame that has gone out of square, shows rot at the sill, or cannot hold a screw after two attempts will not be saved by new glass. Fog between the panes means the sealed unit has failed, not the frame, so replacing the glass restores clarity without touching the walls or the finishing. Check the sill line with a level before you agree to a full swap, since a sound profile with a bad unit is the cheaper path.
Warranty terms and the payment order are the last things a buyer checks before confirming a job. Below are the cover we give, what falls outside it, and the steps from a first message to the bill.
We give a 5-year warranty on window installation, 3 years on a replaced glass unit and 1 year on window repair covering both labour and the parts we fit. The installation cover follows the whole assembly, so a sash that starts catching or a frame that shifts is ours to correct. On a repair call the year applies to the new seal, hinge or handle and to the work that put it in. Wear parts you damage yourself — a cracked pane from a football, a bent handle from forcing a lock — sit outside the terms, and we say so at the visit, not after the invoice. A draught or condensation reported in the first season is treated as a service call, so log it early with the date and the room rather than waiting for the next winter.
Message us on WhatsApp and we reply within five minutes, we work seven days a week, and you pay after installation by cash, card or Kaspi once the price is fixed in the order after measuring. The crews that arrive are our own, not teams picked up for the day, so the person who measures answers to the same people who fit the frame. The measurer brings the samples, so the profile and glass unit choice happens at your window rather than over the phone. Booking the measuring visit before comparing quotes gives you a fixed figure to compare against, because a price agreed before the opening is measured is only an estimate.
A short recap of what keeps a window performing for years, from the first visit to the moment you sign off on the finished opening.
Double glazing, adjustment, fitting, selection
Konstantin Selenenkovsenior mosquito screen specialist, 10 years in the tradeOnline · replies within 5 minutes
Ask a questionYes, if the profile and hardware are in good condition, the double glazing can be replaced without removing the frame — this is faster than a full replacement. But if the seam is freezing or the seal is worn, replacing the double glazing alone won't solve the problem.
Most often it's enough to adjust the hardware and replace the seal if the frame and sash are intact. A replacement is needed when there's a draft along the fitting seam, the profile is warped, or the sash geometry is compromised.
In a panel building the opening is usually standard and even, while in a private house the walls can be thicker and uneven, so the fixings and seam insulation are chosen based on the wall material. The exact fitting method is determined by the free measuring visit on site.
Inspect the seam around the frame perimeter — it should be filled and sealed, the sashes should close tightly without distortion or drafts. Check that the windowsill is level and there are no gaps under the reveals.
Moving furniture out is not necessary, but it's better to move it away from the window and cover it with film, and take down the curtains — dust and small debris fly during removal. This keeps the room cleaner and gives the fitters more space to work.
For Aktobe's windy and dusty climate, a double-chamber double glazing with energy-saving coating and a tight seal is chosen, and on a noisy street sound-insulating glass is added. The specific configuration is selected during the free measuring visit.
Thank you. We will call you back within 10 minutes!
Your order number is on the receipt or in the SMS. Choose where to leave your review.
Write a review on WhatsApp